HIGHLIGHTS:
- M&I Resources for higher-grade satellite deposits at the Koné project have increased by 1.1Moz to 1.7Moz at 1.51 g/t Au compared to 520koz at 1.48 g/t Au which was used as a basis for the 2024 Updated Feasibility Study (“UFS”) whilst Inferred Resources for satellite deposits have increased from nil to 0.8Moz at 1.34 g/t Au
- Koné project overall M&I Resource increased by 1.4Moz to 6.3Moz, with grade up 27% to 0.80 g/t Au and Inferred Resources increased by 1.6Moz to 2.0Moz with grade up 36% to 0.68 g/t Au, compared to the basis used for the UFS
- Exceeded target set in October 2024 of delineating +1Moz of M&I Resources at a grade >50% higher than that of the Koné deposit (2024 M&I Resources stood at 0.59 g/t Au), with the goal of supplementing production from the onset
- Mineralization intercepted at 25 targets with a growing pipeline of +20 targets still to be drill tested, while 12 deposits have now been delineated compared to 2 in the 2024 UFS based on a disciplined exploration approach consisting of outlining starter resources to assess grade and size of targets to prioritize subsequent infill and step-out drilling efforts
- M&I Resource grades of new discoveries range between 1.3 to 2.0 g/t Au for notable deposits such as Petit Yao (1.51 g/t Au), Gbongogo South (1.47 g/t Au), Soman (1.42 g/t Au), Koban North (1.29 g/t Au), Sena (2.06 g/t Au), Diouma North (1.33 g/t Au), ANV (1.83 g/t Au), Yeré North (2.03 g/t Au), and Lokolo Main (1.92 g/t Au)
- Step-out and infill drilling has mainly focused on growing M&I Resources at the Gbongogo Main, Gbongogo South, Koban North and ANV deposits with M&I Resources standing at respectively 783koz at 1.51 g/t Au, 230koz at 1.47 g/t Au, 167koz at 1.29 g/t Au and 168koz at 1.83 g/t Au, with further exploration underway
- Maiden M&I Resource achieved for Petit Yao of 102koz at 1.51 g/t Au with maiden Inferred Resource of 391koz at 1.28 g/t Au, while drilling is ongoing and mineralised extensions have been identified
- Further resource updates are expected throughout the year with a 90,000-meter programme for the year well underway
- Construction of the Koné project remains on-budget and ahead of schedule with first gold pour targeted in late Q4-2026
ABIDJAN, Côte d’Ivoire, June 15, 2026 (GLOBE NEWSWIRE) — Montage Gold Corp. (“Montage” or the “Company”) (TSX: MAU, OTCQX: MAUTF) is pleased to report that it has continued to make higher grade satellite discoveries at its Koné project, in Côte d’Ivoire, where construction remains on-budget and ahead of schedule with first gold pour targeted in late Q4-2026.
Martino De Ciccio, CEO of Montage commented: “We are pleased with our continued progress to unlock exploration value at the Koné project, where construction remains on-budget and ahead of schedule with first gold pour expected in late Q4-2026.
Since the publication of the 2024 Updated Feasibility Study, a total of approximately 330,000 metres has been drilled in addition to the 118,525 metres completed prior, focused on discovering higher-grade satellite deposits with the objective of enhancing the production profile of the operation from the commencement of production. In support of this objective, in October 2024 we published a target of delineating more than 1Moz of M&I Resources at a grade at least 50% higher than that of the Koné deposit, and we are very pleased to have already significantly exceeded this target.
We look forward to unlocking additional exploration value across the Koné project and our broader exploration portfolio as we continue on our journey of creating a premier multi-asset African gold producer and unlocking value for all stakeholders.”
Silvia Bottero, EVP Exploration of Montage, commented: “To maximize the efficiency of the exploration programme, we have adopted a systematic approach whereby we initially drill test the highest-priority targets to confirm their potential and define starter resources to validate grade profiles before undertaking larger infill and step-out drilling campaigns. As such, our ongoing exploration programme continues to focus on three parallel workstreams: infill and step-out drilling of previously delineated deposits, advancing targets towards maiden resource status, and testing new targets through regional scout drilling.
We look forward to continuing to aggressively advance exploration across the Koné project through the ongoing 90,000-meter drill programme, which we expect will support further resource updates throughout the year. Looking ahead, we are also excited by the ongoing exploration programmes across our broader Côte d’Ivoire portfolio, including at Didievi and Wendé.”
RESOURCE UPDATE AND EXPLORATION OVERVIEW
Since the publication of the 2024 Updated Feasibility Study (“UFS”), a total of approximately 330,000 metres has been drilled in addition to the 118,525 meters completed prior, focused on discovering higher-grade satellite deposits with the objective of boosting production from the onset. In support of this objective, a target of delineating over 1Moz of M&I Resources at a grade at least 50% higher than that of the Koné deposit (2024 M&I Resources stood at 0.59 g/t Au) was published in October 20241, which has now been significantly exceeded.
As shown in Table 1 below, M&I Resources for higher grade satellite deposits have increased by 1.14Moz to 1.66Moz at 1.51 g/t Au compared to 520koz at 1.48 g/t Au, which was used as a basis for the 2024 UFS whilst Inferred Resources for satellite deposits have increased from nil to 766koz at 1.34 g/t Au. As a result, the overall Koné project M&I Resource has now increased by 1.42Moz to 6.29Moz, with grade improving by 27% to 0.80 g/t Au, and Inferred Resources have increased by 1.62Moz to 2.03Moz, with grade increasing by 36% to 0.68 g/t Au, compare to the basis used for the 2024 UFS.
Table 1: Koné project consolidated Mineral Resource Estimate variance versus previous estimates
| UPDATED FEASIBILITY STUDY1 (Published January 2024) |
YEAR-END 2025 MRE2 (Published March 2026) |
UPDATED MRE3 (Published June 2026) |
Δ UFS1 vs. MRE3 | ||||||||||
| Tonnage | Grade | Content | Tonnage | Grade | Content | Tonnage | Grade | Content | Content | ||||
| (Mt) | (Au g/t) | (Au koz) | (Mt) | (Au g/t) | (Au koz) | (Mt) | (Au g/t) | (Au koz) | (Au koz) | ||||
| Koné deposit | |||||||||||||
| Measured | – | – | – | 8.6 | 0.83 | 229 | 8.6 | 0.83 | 229 | +229 | |||
| Indicated | 229 | 0.59 | 4,340 | 200 | 0.68 | 4,404 | 200 | 0.68 | 4,404 | +64 | |||
| Measured & Indicated | 229 | 0.59 | 4,340 | 209 | 0.69 | 4,632 | 209 | 0.69 | 4,632 | +292 | |||
| Inferred | 25 | 0.50 | 400 | 75 | 0.52 | 1,259 | 75 | 0.52 | 1,259 | +859 | |||
| Satellite deposits | |||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||
| Indicated | 11 | 1.48 | 520 | 29 | 1.34 | 1,249 | 34 | 1.51 | 1,660 | +1,140 | |||
| Measured & Indicated | 11 | 1.48 | 520 | 29 | 1.34 | 1,249 | 34 | 1.51 | 1,660 | +1,140 | |||
| Inferred | – | – | – | 8.8 | 1.07 | 303 | 18 | 1.34 | 766 | +766 | |||
| Total Koné Project | |||||||||||||
| Measured | – | – | – | 8.6 | 0.83 | 229 | 8.6 | 0.83 | 229 | +229 | |||
| Indicated | 240 | 0.63 | 4,870 | 229 | 0.77 | 5,652 | 236 | 0.80 | 6,064 | +1,194 | |||
| Measured & Indicated | 240 | 0.63 | 4,870 | 238 | 0.77 | 5,881 | 244 | 0.80 | 6,292 | +1,422 | |||
| Inferred | 25 | 0.50 | 400 | 84 | 0.58 | 1,562 | 93 | 0.68 | 2,025 | +1,625 | |||
| 1) Updated Feasibility Study available on Montage’s website and on SEDAR+. 2) Year-End 2025 MRE as disclosed in the Company’s press release dated March 30, 2026, available on Montage’s website and on SEDAR+. 3) Refer to note 3 on Table 2 and “Technical Disclosure” below for further details. | |||||||||||||
As shown in Figure 1 below, 12 deposits have now been delineated compared to 2 in the 2024 UFS, while mineralization has been intercepted at 25 targets with a growing pipeline of over 20 exploration targets remaining to be drill tested, across 7 mineralized trends.
Figure 1: Koné project exploration trends, target map and mineral deposits

In order to maximize the efficiency of the exploration programme, the approach undertaken has been to systematically drill test best selected targets to confirm their potential and define starter resources to validate grade profiles before undertaking larger step-out drilling campaigns. Table 2 below presents the updated Mineral Resource Estimate by deposit for all satellite deposits along with their status and current programme of exploration. Infill and step-out drilling efforts have progressed at the Gbongogo South, Koban North, Petit Yao and ANV deposits following the delineation of starter resources, with infill and step-out drilling expected to ramp-up at other selected deposits for which a starter resources have been declared.
Table 2: Koné project satellite deposits detailed Mineral Resource Estimate variance versus previous estimates
|
|
UPDATED FEASIBILITY STUDY1 (Published January 2024) |
YEAR-END 2025 MRE2 (Published March 2026) |
UPDATED MRE3 (Published June 2026) |
Δ YE MRE2 vs. MRE3 | |||||||||||
| Tonnage | Grade | Content | Tonnage | Grade | Content | Tonnage | Grade | Content | Content | ||||||
| (Mt) | (Au g/t) | (Au koz) | (Mt) | (Au g/t) | (Au koz) | (Mt) | (Au g/t) | (Au koz) | (Au koz) | ||||||
| Gbongogo Main | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | 11 | 1.48 | 520 | 16 | 1.51 | 783 | 16 | 1.51 | 783 | – | |||||
| Measured & Indicated | 11 | 1.48 | 520 | 16 | 1.51 | 783 | 16 | 1.51 | 783 | – | |||||
| Inferred | – | – | – | 1.2 | 1.08 | 41 | 1.2 | 1.08 | 41 | – | |||||
| Gbongogo South | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 3.9 | 1.22 | 154 | 4.9 | 1.47 | 230 | +76 | |||||
| Measured & Indicated | – | – | – | 3.9 | 1.22 | 154 | 4.9 | 1.47 | 230 | +76 | |||||
| Inferred | – | – | – | 1.8 | 1.17 | 70 | 1.7 | 1.41 | 75 | +6 | |||||
| Koban North | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 4.1 | 1.07 | 141 | 4.0 | 1.29 | 167 | +26 | |||||
| Measured & Indicated | – | – | – | 4.1 | 1.07 | 141 | 4.0 | 1.29 | 167 | +26 | |||||
| Inferred | – | – | – | 1.5 | 0.89 | 43 | 0.1 | 0.95 | 2.9 | (40 | ) | ||||
| Soman | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | – | – | – | 1.3 | 1.42 | 58 | +58 | |||||
| Measured & Indicated | – | – | – | – | – | – | 1.3 | 1.42 | 58 | +58 | |||||
| Inferred | – | – | – | – | – | – | 1.5 | 1.16 | 57 | +57 | |||||
| Sena | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | – | – | – | 0.36 | 2.06 | 24 | +24 | |||||
| Measured & Indicated | – | – | – | – | – | – | 0.36 | 2.06 | 24 | +24 | |||||
| Inferred | – | – | – | 0.42 | 1.00 | 14 | 0.7 | 2.36 | 54 | +40 | |||||
| Diouma North | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 0.38 | 0.95 | 12 | 1.0 | 1.33 | 43 | +31 | |||||
| Measured & Indicated | – | – | – | 0.38 | 0.95 | 12 | 1.0 | 1.33 | 43 | +31 | |||||
| Inferred | – | – | – | 0.01 | 1.00 | 0.3 | 0.55 | 1.22 | 22 | +21 | |||||
| Petit Yao | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | – | – | – | 2.1 | 1.51 | 102 | +102 | |||||
| Measured & Indicated | – | – | – | – | – | – | 2.1 | 1.51 | 102 | +102 | |||||
| Inferred | – | – | – | – | – | – | 9.5 | 1.28 | 391 | +391 | |||||
| ANV | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 4.0 | 1.05 | 136 | 2.9 | 1.83 | 168 | +32 | |||||
| Measured & Indicated | – | – | – | 4.0 | 1.05 | 136 | 2.9 | 1.83 | 168 | +32 | |||||
| Inferred | – | – | – | 3.3 | 1.09 | 117 | 1.2 | 1.99 | 79 | (38 | ) | ||||
| Yeré North | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 0.19 | 1.05 | 6.4 | 0.4 | 2.03 | 28 | +21 | |||||
| Measured & Indicated | – | – | – | 0.19 | 1.05 | 6.4 | 0.4 | 2.03 | 28 | +21 | |||||
| Inferred | – | – | – | 0.43 | 1.10 | 15 | 0.1 | 1.39 | 3.1 | (12 | ) | ||||
| Lokolo Main | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 0.30 | 1.61 | 16 | 0.50 | 1.92 | 31 | +16 | |||||
| Measured & Indicated | – | – | – | 0.30 | 1.61 | 16 | 0.50 | 1.92 | 31 | +16 | |||||
| Inferred | – | – | – | 0.11 | 1.10 | 3.9 | 0.83 | 0.82 | 22 | +18 | |||||
| Lokolo Northwest | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | – | – | – | 0.76 | 1.10 | 27 | +27 | |||||
| Measured & Indicated | – | – | – | – | – | – | 0.76 | 1.10 | 27 | +27 | |||||
| Inferred | – | – | – | – | – | – | 0.49 | 1.22 | 19 | +19 | |||||
| Total satellite deposits | |||||||||||||||
| Measured | – | – | – | – | – | – | – | – | – | – | |||||
| Indicated | – | – | – | 29 | 1.34 | 1,249 | 34 | 1.51 | 1,660 | +411 | |||||
| Measured & Indicated | – | – | – | 29 | 1.34 | 1,249 | 34 | 1.51 | 1,660 | +411 | |||||
| Inferred | – | – | – | 8.8 | 1.07 | 303 | 18 | 1.34 | 766 | +463 | |||||
| 1) Updated Feasibility Study available on Montage’s website and on SEDAR+. 2) Year-End 2025 MRE as disclosed in the Company’s press release dated March 30, 2026, available on Montage’s website and on SEDAR+. 3) The updated MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The updated MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed and approved by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Updated MRE includes changes to the Koban North deposit, with an effective date of November 28, 2025; Gbongogo South, Diouma North and Petit Yao deposits, with an effective date of January 20, 2026; and the Sena, Soman, ANV, Yeré North, Lokolo Main and Lokolo Northwest deposits, with an effective date of April 15, 2026. The updated MRE for the Gbongogo South, Koban North, Soman, Sena, Diouma North, Petit Yao, Lokolo Main and Lokolo Northwest deposits are reported at a gold cut-off grade of 0.50 g/t Au, and the ANV and Yeré North deposits are reported at a gold cut-off grade of 0.60 g/t Au. All deposits are constrained with an optimised open-pit shell generated using a gold price of US$2,500 per ounce. The MRE for the Koné and Gbongogo Main deposits are unchanged from their previous estimates, as published on March 30, 2026, available on Montage’s website and on SEDAR+. The updated MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” below for further details. |
|||||||||||||||
As shown in Figure 2 below, the Koné project exploration target triangle continues to evolve, with notable movement of targets up the triangle reflecting the improvement in their confidence as a result of the exploration programmes.
Figure 2: Koné project exploration target triangle evolution

Note: Refer to press release dated October 7, 2024, for further details on target definitions.
Systematic exploration of targets and evaluation of all available geological data, including geological maps, cross sections, structural data, surface geology, geochemistry, geophysics, regolith mapping, alteration profiles, drilling data, cores, analysis of artisanal mining activity, outcrops, and other survey data, ensures a continuous process of developing a structured exploration targets pipeline.
The ongoing exploration programme continues to focus across three parallel tracks:
- Infill and extension drilling of previously delineated starter deposits, including the more advanced Gbongogo South, Koban North, Soman, Petit Yao and ANV deposits, as well as other previously delineated deposits with starter resources;
- Advancing pre-resource targets toward maiden resource definition, such as at ANIII; and
- Testing new targets across the project’s extensive land package, based on systematic drilling of best selected targets to confirm their potential and define starter resources to validate their grade profiles before undertaking larger step-out drilling campaigns.
DETAILS FOR SELECTED NEW SATELLITE DEPOSITS
Gbongogo South deposit on the Gbongogo-Koroutou trend
A total of 6,478 meters of reverse circulation (“RC”) drilling has been completed at Gbongogo South since July 2025, across 35 holes, with the objective of improving resource confidence, extending mineralized envelope extensions and validating the continuity of geological data.
Notable drilling intercepts over this period include the following:
- GBRC0486: 8 meters at 5.09 g/t Au (incl. 1 meter at 12.31 g/t Au and 1 meter at 17.36 g/t Au); 13 meters at 3.50 g/t Au (incl. 1 meter at 25.99 g/t Au); 2 meters at 3.01 g/t Au; 3 meters at 3.86 g/t Au; 3 meters at 1.80 g/t Au; and 3 meters at 1.51 g/t Au;
- GBSRC0508: 7 meters at 1.50 g/t Au; 3 meters at 1.19 g/t Au; 2 meters at 2.89 g/t Au; 8 meters at 4.23 g/t Au (incl. 1 meter at 14.81 g/t Au); 4 meters at 1.05 g/t Au; and 5 meters at 0.81 g/t Au; and
- GBSRC0478: 5 meters at 2.65 g/t Au; 2 meters at 3.96 g/t Au; 12 meters at 1.55 g/t Au.
Mineralisation remains open downdip and along strike, as shown in Figure 3 below. Drilling is in progress which is expected to yield a further resource update.
Figure 3: Gbongogo South plan view showing optimal pit shell and drilling intercept highlights

Koban North deposit on the Gbongogo-Koroutou trend
A total of 3,603 meters of diamond drillhole (“DD”), RC and RC-DD drilling has been completed at Koban North since July 2025, across 31 holes, successfully improving resource confidence and extending mineralized envelopes.
Notable drilling intercepts over this period include the following:
- KBNDD008: 6 meters at 1.74 g/t Au; 2 meters at 2.25 g/t Au; and 14.5 meters at 1.65 g/t Au;
- KBNRC0120: 6 meters at 1.14 g/t Au; 2 meters at 2.00 g/t Au; 5 meters at 1.86 g/t Au; and 4 meters at 1.81 g/t Au;
- KBNRC099: 10 meters at 5.42 g/t Au (incl. 1 meter at 17.68 g/t Au; and incl. 1 meter at 14.94 g/t Au); and
- KBNRC098: 12 meters at 1.45 g/t Au.
Shallow depth exploration step-out drilling in an area approximately 300 meters northeast of the Koban North deposits has intercepted mineralization, suggesting the continuity of the mineralised system extending over 1km in strike length, notably:
- KBNRC0126: 16 meters at 0.94 g/t Au; and
- KBNRC0128: 2 meters at 1.53 g/t Au.
Figure 4: Koban North plan view showing optimal pit shell and drilling intercept highlights

Soman deposit on the Gbongogo-Koroutou trend
A total of 21,648 meters of auger, Air Core (“AC”), RC and DD have been drilled at the Soman deposit to date, culminating in the reporting of maiden resources in the MRE. The Soman deposit hosts a suite of volcano-sediments, with mineralization stretching over a known NE-SW strike of at least 800 meters in length, and across two parallel structures. The splays of mineralization are located approximately 1 kilometer from the main Gbongogo-Koroutou trend, corresponding to a zone of interpreted dilation formed at the intersection of NNE and NE trending strikes, possibly linked to sinistral shear and faulting movement. Mineralization is hosted within the broad package of volcano-sediments, locally affected by fracturing and exhibiting quart-carbonate and quartz-tourmaline veins.
Notable intercepts from recent drilling include:
- SORC0153: 22 meters at 3.52 g/t Au (incl. 1 meter at 16.71 g/t Au; 1 meter at 11.47 g/t Au; 1 meter at 16.75 g/t Au; 1 meter at 11.93 g/t Au); 3 meters at 5.08 g/t Au; and 2 meters at 2.17 g/t Au;
- SORC0110: 9 meters at 7.03 g/t Au (incl. 1 meter at 47.74 g/t Au); 2 meters at 1.28 g/t Au; and
- SORC094: 2 meters at 1.42 g/t Au; 3 meters at 1.25 g/t Au; 10 meters at 2.99 g/t Au; 2 meters at 1.97 g/t Au; 4 meters at 1.21 g/t Au.
Figure 5: Soman plan view showing optimal pit shell and drilling intercept highlights

Mineralisation has been defined to a vertical depth of 150 meters and is still open in all directions. Further infill and step-out drilling is planned throughout 2026, aiming to define the open extensions along strike and down dip, as shown in Figures 6 and 7 below.
Figure 6: Soman 1 block model cross section

Figure 7: Soman 2 block model cross section

Petit Yao deposit
The Petit Yao deposit is located approximately 7km from the Koné processing plant and within the existing mining permit. Since January 2025, the Company completed 22,434 meters of infill and step-out drilling at the Petit Yao deposit, across 378 holes. Drilling included 18,214 meters of RC drilling across 160 holes, 1,393 meters of DD drilling across 10 holes, 1,320 meters of RC-DD drilling across 7 holes and 1,508 meters of auger drilling across 201 holes.
Notable intercepts from the recent drilling programme include:
- PYRC0050: 16 meters at 1.24 g/t Au;
- PYRC0073A: 12 meters at 2.57 g/t Au (incl. 1 meter at 18.47 g/t Au); and
- PYRC0047: 4 meters at 6.72 g/t Au.
The Petit Yao deposit demonstrates significant potential to increase the resource as the latest MRE does not incorporate all results from the ongoing 12,500 meters of RC and DD infill and step out drilling at Petit Yao. The deposit remains open to the northwest and southeast, and at depth, as shown in Figure 8 below.
Figure 8: Petit Yao plan view showing optimal pit shell and drilling intercept highlights

The Petit Yao deposit is interpreted to lie on the limb of a large-scale regional fold with a northwest-trending fold axis, based on geological logging and interpretation of magnetic geophysical data. Lithologies comprise Birimian fine grained sediments intercalated with mafic volcanics, locally intruded by diorite. Mineralisation consists of a set of shear-hosted parallel quartz- pyrite ± tourmaline vein sets, associated with sericite and silica host rock alteration, preferentially exploiting the contact between these lithologies. The main mineralised zone is gently dipping 30° to the southwest and is still open downdip, as indicated in Figure 9 below where the resource model is data constrained.
Figure 9: Petit Yao cross section of block model

ANV deposit on the Sissédougou trend
A total of 6,050 meters of exploration RC drilling has been completed at ANV since June 2025, across 68 holes, successfully improving resource confidence and extending mineralized envelopes, in particular towards the northern extents of the deposits. Previous drilling on the deposit had highlighted potential extensions, whilst infill drilling has consequently improved the confidence of those extensions and demonstrated the continuity of mineralised structures. Drilling continues on the deposit, providing an opportunity for further resource growth throughout the year.
Notable drilling intercepts demonstrating the continuity of mineralisation downdip and along strike include:
- SDRC0301: 38 meters at 1.36 g/t Au; and
- SDRC0281: 7 meters at 2.85 g/t Au (including 1 meter at 17.04 g/t Au).
Additionally, previously identified parallel and sub-parallel structures were drill tested and all were demonstrated to host mineralized extensions, as shown in Figure 10 below, with positive intercepts outside of the current optimised pit shell including:
- NW-splay, RSDRC0318: 7 meters at 5.86 g/t Au (incl. 1 meter at 27.96 g/t Au);
- NE- trending parallel structure, SDRC0278: 5 meters at 1.61 g/t Au;
- NE-trending parallel structure: SDRC0263: 6 meters at 1.11 g/t Au; and
- SW-extension, SDRC0285: 4 meters at 5.86 g/t Au.
Figure 10: ANV plan view showing optimal pit shell and drilling intercept highlights

The 2026 ANV MRE model update incorporates a revised modelling approach, with interval selection guided by geological, structural, alteration and continuity criteria. High grade shoots demonstrate alignment between adjacent drillholes, supporting robust geological continuity and indicating strong potential for down dip extension beyond the current drilling limit.
Figure 11: ANV composite compared to block model grades (left) and domains (right)
https://www.globenewswire.com/NewsRoom/AttachmentNg/cc060175-e0d3-4b62-9755-ed3912164049
Other reported deposits in the updated MRE
The Sena and Diouma North deposits on the Gbongogo-Koroutou trends, the Yeré North deposit on the Yeré trend, and Lokolo Main on the Lokolo Trend have also been subject to a geological re-interpretation, enabling greater resolution of mineralised envelopes. All deposits remain open and subject to further step-out drilling to continue to define the extents of mineralisation. Additionally, drilling took place on the Lokolo Northwest deposit, which shares similar geological and structural characteristics to the Lokolo Main deposit, resulting in a maiden resource in the MRE. The MRE for all other reported deposits reflect an improved modelling approach and explicit modelling of veins sets through the ordinary kriging methodology, whereas they were previous modelled under multiple indicator kriging.
UPCOMING GROUP CATALYSTS
Key upcoming catalysts across the Company include:
Table 3: Key upcoming catalysts
| PROPERTY | CATALYST |
| Koné project |
|
| Didievi project |
|
| Wendé property |
|
| Mauritania greenfield properties |
|
ABOUT MONTAGE GOLD
Montage Gold Corp. (TSX: MAU) is a Canadian-listed company focused on becoming a premier multi-asset African gold producer, with its flagship Koné project, located in Côte d’Ivoire, at the forefront. Based on the Updated Feasibility Study published in 2024 (the “UFS”), the Koné project has an estimated 16-year mine life and sizeable annual production of +300koz of gold over the first 8 years and is expected to enter production in late Q4-2026. The Company has also built a high-quality, multi-asset growth pipeline including the Didievi and Wendé properties in Côte d’Ivoire, and a portfolio of prospective exploration tenements in Mauritania.
CONTACT INFORMATION
| For Investor Relations Inquiries: Jake Cain Strategy & Investor Relations Manager jcain@montagegold.com +44-7788-687-567 |
For Media Inquiries: John Vincic Oakstrom Advisors john@oakstrom.com +1-647-402-6375 |
For Regulatory Inquiries: Kathy Love Corporate Secretary klove@montagegold.com +1-604-512-2959 |
QUALIFIED PERSONS STATEMENT
The scientific and technical contents of this press release have been verified and approved by Silvia Bottero, BSc, MSc, a Qualified Person pursuant to National Instrument 43-101. Mrs. Bottero, EVP Exploration of Montage, is a registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (SACNASP), a member of the Geological Society of South Africa and a Member of AusIMM.
The Qualified Person for each MRE in this press release other than the UFS is Dr. Gregory Zhang of Snowden Optiro (Australia) who meets the requirements of NI 43-101 and is independent of Montage Gold Corp. Dr. Gregory Zhang is a member in good standing of the MAIG and MausIMM and has sufficient relevant experience with the type of mineralization, deposit type, and activity undertaken to qualify as a Qualified Person under NI 43-101.
Dr. Zhang did not directly participate in the fieldwork, but conducted a thorough review of the geological interpretation, drilling database, QA/QC results, and estimation methodology. In addition, he performed an independent peer review of the satellite deposits resource models, including checks on domain construction, variography, estimation parameters, and validation outputs. Dr. Zhang concluded that the resource modelling processes implemented by Montage Gold is consistent with industry best practices and provide a sound basis for classification and reporting of Mineral Resources. Dr. Gregory Zhang accepts full professional responsibility for each MRE in this press release other than the UFS, as presented in this press release.
TECHNICAL DISCLOSURE
Mineral Resource Estimates
Koné deposit MRE and Gbongogo Main deposit MRE
The Koné deposit MRE and the Gbongogo Main deposit MRE were previously published on March 30, 2026. For further details and technical disclosures, please refer to the news release dated March 30, 2026, titled “Montage Gold Announces Grade Control Results and Resource Increase For Its Koné and Gbongogo Main Deposits at Its Koné Project”, available on Montage’s website, and on SEDAR+.
Satellite deposits MRE
The MRE for the satellite deposits (Gbongogo South, Soman, Sena, Diouma North, Petit Yao, ANV, Yeré North, Lokolo Main and Lokolo Northwest deposits) have been prepared by Mr. Rolly Wasonga, a full-time employee as Mineral Resource Manager of Montage Gold, and a Qualified Person (“QP”) as defined under NI 43-101, with sufficient experience relevant to the styles of mineralization and types of deposits under consideration.
The MRE for Koban North, was prepared independently by Dr. Julien Feneyrol (EurGeol) of Arethuse Geology and peer reviewed by Mr. Remy Bosc (EurGeol) of Arethuse Geology, both QPs as defined under NI 43-101 and independent of Montage Gold.
All the estimates in the MREs were independently reviewed and approved by Mr. Gregory Zhang of Snowden Optiro (Australia), a QP as defined under NI 43-101 and independent of Montage Gold. The MRE has been classified and reported in accordance with NI 43-101 and CIM Definition Standards (May 2014). Effective dates are November 28, 2025 for Koban North; January 20, 2026 for Gbongogo South, Diouma Northand Petit Yao; and April 15, 2026 for Sena, Soman, ANV, Yeré North, Lokolo Main and Lokolo NW.
The MRE for the satellite deposits has been built on a revised geology-driven modelling approach, replacing the previous Multiple Indicator Kriging (“MIK”) and, at Koban North, Localised Uniform Conditioning (“LUC”) methodologies used in earlier model iterations. Mineralized domains are defined as explicit hard-boundary wireframes generated from a combined geological and quantitative workflow integrating DomainMCF (Maptek Computing Framework), Leapfrog implicit modelling and interval selection guided by geological, structural, alteration and grade-continuity criteria. A low-grade mineralized envelope at a 0.2 g/t Au cut-off was used to constrain the wireframes, with high-grade sub-domains modelled separately at a 1.0 g/t Au cut-off where supported by grade continuity, to limit grade smearing during estimation. Mineral Resources were estimated using a geology-driven Ordinary Kriging (“OK”) approach with dynamic anisotropy applied via control surfaces representing the overall structural geometry, such that variogram and search ellipsoids unfold dynamically along the modelled mineralized trends. At Koban North, two of the eleven modelled wireframes (solids 3 and 11) were estimated using inverse distance squared (“ID²”) due to limited composite numbers.
Gold assay data were composited to a dominant 1-meter sample length and analysed on a domain-by-domain basis. Top-capping thresholds were determined using a combined approach of histograms, log-probability plots and disintegration analysis (cap percentile range of 98.1% to 100% across the satellites, with deposit-specific cap values), complemented by high-yield restrictions to limit the spatial influence of outlier composites while preserving the overall grade distribution and geological continuity. Block size and search parameters were optimized through Kriging Neighbourhood Analysis (“KNA”), informed by drill spacing, domain thickness, slope of regression and kriging efficiency sensitivity, with a multi-pass search strategy progressively expanded to ensure full block estimation. Geological modelling and wireframing were performed in Leapfrog and Vulcan (Surpac for Koban North) while compositing, block modelling and grade estimation were completed in Maptek Vulcan (and Surpac at Koban North); statistical analysis, variography and KNA were undertaken in Supervisor and Python.
Bulk density measurements were determined using the immersion (water displacement) method on diamond core samples, providing reliable density estimates across the different weathering domains (saprolite, saprock and fresh rock), with values of 1.60–1.80 t/m³ (saprolite), 1.85–2.55 t/m³ (saprock) and 2.70–2.85 t/m³ (fresh rock) across the Koné Project deposits, including Koné, Gbongogo (Main and South), Koban North, Yeré North, ANV, Lokolo (Main and Northwest), Sena and Soman, with deposit-specific values applied based on available measurements or analogues.
Mineral Resource classification is based on drill spacing, geological continuity and estimation quality, supported by geostatistical parameters including kriging efficiency (“KE”) and slope of regression (“SoR”) and mining infrastructure. Indicated Resources are typically defined on ~25–50 meter drill spacing with moderate to high confidence in continuity and estimation quality; Inferred Resources are defined on wider drill spacing (up to ~100 meters) with lower confidence. Areas lacking sufficient data density or geological confidence are excluded from the Mineral Resource Estimate. Model validation comprised visual comparison of estimated grades with informing composites in section and plan view, block-versus-wireframe volumetric flagging, declustering checks and swath plot analysis, confirming acceptable agreement at the global scale, with localised under- or over-estimation falling within acceptable bounds and noted on a deposit basis.
Optimal pit constraints:
To satisfy the definition of Mineral Resources having reasonable prospects for eventual economic extraction, the estimates are constrained within optimised open pit shells generated by the Montage technical team using the corporate metal prices and cost assumptions. The following key parameters apply to all satellite deposits:
- Gold price of US$2,500/oz
- Combined royalties of 6%
- Processing recovery of 90%
- Overall slope angles of 35°, 40° and 45° were applied for saprolite, saprock and fresh rock, respectively, at Gbongogo South, Sena, Diouma North, Yeré North, Lokolo Main and Lokolo Northwest, while steeper angles of 40°, 45° and 50° were adopted for Koban North, Soman, Petit Yao and ANV, reflecting local geotechnical conditions
- Mining costs of US$3.42 per tonne
- Processing costs (including G&A) of US$9.92 per tonne
- Cut-off grade of 0.5 g/t Au for reporting for Gbongogo South, Koban North, Soman, Sena, Diouma North, Petit Yao, Lokolo Main, and Lokolo North West
- Cut-off grade of 0.6 g/t Au for reporting for ANV and Yeré North
- Haulage Costs per tonne: Gbongogo South: US$7.90, Koban North: US$9.20, Soman: US$7.90, Sena: US$8.60, Diouma North: US$7.70, Petit Yao US$1.54, ANV: US$13.20, Yeré North: US$16.30, Lokolo Main and Lokolo Northwest: US$7.70
Gbongogo South Modelling
The drilling dataset compiled for the Gbongogo South MRE comprises 549 RC holes for 53,339 meters, 97 DD holes for 23,885 meters and 22 RC-with-diamond-tail (“RD”) holes for 4,428 meters, totalling approximately 81,652 meters of resource and surrounding drilling integrated across the broader Gbongogo–Koroutou trend area, complemented by 715 aircore (“AC”) scout holes (20,401 meters) used for near-surface mineralization continuity but not in the estimation. The database includes drilling by Endeavour, Randgold and Montage over 2016–2025, with critical deep holes drilled in November 2025 providing additional geological control on the high-grade corridor.
Gbongogo South lies immediately south of Gbongogo Main along the Gbongogo–Koroutou corridor and shares a comparable stratigraphic setting, defined by a mafic volcanic unit and a mixed volcano-sediment unit with amphibole-bearing gabbro intrusions exploiting the contact between the two domains. Mineralization is preferentially hosted within the mafic volcanic unit, occurring as anastomosed sub-parallel lenses 2–20 meters wide controlled by brittle–ductile deformation, characterized by quartz ± tourmaline ± carbonate veining with silica, tourmaline and K-feldspar alteration and disseminated fine pyrite. The dominant fabric (foliation “FO”) has a mean orientation of 57°/255°, lithological contacts strike 53°/281°, and vein–host contacts have an average orientation of 45°/263°. The mineralized system extends over approximately 1.2 kilometres of strike along a NNW trend (~350°) and remains open along strike and at depth. Three principal lode groups were modelled: the 2000 series (8 sub-parallel low-grade lodes 2001–2008), the nested 2100 series (3 high-grade domains 2101–2103) and the 9000 series (6 internal-waste domains 9001–9006). Drill spacing is approximately 25 m × 25 m for advanced grade control, 50 m × 50 m for resource drilling and greater than 50 m for exploration.
Bulk densities were assigned on a weathering basis using the immersion (water displacement) method on diamond core samples, with values of 1.64 t/m³ for saprolite, 2.38 t/m³ for saprock, and 2.78 t/m³ for fresh rock, based on density measurements collected across the Gbongogo South and adjacent Diouma North deposits.
The US$2,500/oz resource pit shell extends over approximately 1.1 kilometers of strike to a maximum depth of around 245 meters
Koban North Modelling
The drilling dataset used for the Koban North MRE comprises 171 holes for approximately 18,651 meters, including 139 RC holes for 13,290 meters, 6 RD holes for 1,162 meters and 26 DD holes for 4,198 meters (of which six DD holes were drilled for geotechnical purposes). The database also includes 31 AC scout holes (1,423 meters) and historical pitting and trenching used locally for wireframe continuity but excluded from grade interpolation. Drilling integrates holes by Montage Gold, Randgold, Barrick and Endeavour, at azimuths between N100° and N120° with dips of 50°–70° ESE on N105°-trending profiles spaced approximately 25 meters apart in the core of the prospect (along-profile spacing ~25–50 meters).
Koban North forms part of the N-S trending Gbongogo–Koroutou corridor and is hosted within deformed metasediments closely associated with a main intrusive body, with mineralized zones typically developed at or just above the contact. Eleven sub-parallel mineralized wireframes were constructed in Surpac (from Leapfrog grade shells using a 0.5 ppm Au cut-off and a 2-meter minimum mineralized intercept) striking ~N010°–N020° and dipping 30°–50° to the WNW, with the main wireframe (Solid 2) extending over approximately 530 meters at the contact with the main intrusive. Capping was applied solid-by-solid (5–8 ppm Au across the capped solids, no capping required on solids 1, 3, 10 and 11). The block model was constructed using a 12.5 m × 6.25 m × 2 m parent block with sub-blocking down to 3.125 m × 1.5625 m × 0.5 m and a model rotation of −70°. Quality control review covered 3,044 QC samples (~15.6% of original samples), with good blank and standard performance, acceptable RC recovery (~88% per hole) and DD recovery (~97%) but with field-duplicate performance flagged as poor and the sample-division procedure recommended for further investigation by Montage.
Bulk densities were assigned on a weathering basis using the immersion method on diamond core samples, with values of 1.66 t/m³ (saprolite), 2.24 t/m³ (saprock) and 2.77 t/m³ (fresh rock).
The US$2,500 resource pit shell extends over approximately 615 meters of strike to a maximum depth of around 145 meters.
Soman Modelling
The drilling dataset used for the maiden Soman MRE comprises 201 RC holes for 20,098 meters and 20 DD holes for 4,987 meters totalling approximately 25,085 meters, complemented by 167 AC scout holes (4,218 meters). The dataset includes 6 historical DD holes (2,707 meters) drilled by Randgold Resources Limited, with the remainder completed by Montage Gold over 2023–2026 covering both Soman 1 and Soman 2 zones.
Mineralization is hosted within a broad volcano-sediment package within a dilation zone formed at the intersection of NNE and NE trending structures, interpreted to be associated with sinistral shear movement, with gold associated with quartz–carbonate and quartz–tourmaline veining accompanied by silicification, ankerite alteration and disseminated to coarse-grained pyrite, with frequent occurrences of visible gold; the mineralized corridor extends over approximately 2.0 kilometres of strike. Four mineralized domains were modelled at two cut-off levels (1001 and 1002 at 0.2 g/t Au; 1101 and 1102 at 1.0 g/t Au), with capping selected within the 98.4–100% percentile range. Block size selection comprised 10 m × 10 m × 5 m parent blocks for the Resource and Advanced Grade Control zones, with 25 m × 25 m × 10 m blocks for waste and exploration domains. Infill drilling is recommended in the transitional zone at Soman 1 (60–90 m depth) and across Soman 2 to upgrade Inferred material.
Bulk densities of 1.6 t/bcm (saprolite), 2.30 t/bcm (saprock) and 2.70 t/bcm (fresh rock) were assigned based on immersion measurements consistent with those applied to other satellite deposits in the project area.
The US$2,500/oz resource pit shell extends over approximately 450 meters of strike to a maximum depth of around 140 meters.
Sena Modelling
The drilling dataset used for the Sena MRE comprises 100 RC holes for 6,826 meters and 2 DD holes for 259 meters totalling approximately 7,085 meters, complemented by 303 AC scout holes (8,724 meters). A total of 61 RC holes were added to the database since the September 2025 model update; all drilling was completed by Montage Gold over 2019–2025.
Sena is located on the Koroutou structural trend, hosted within a volcano-sedimentary sequence comprising rhyolitic and basaltic units, with the principal host lithologies comprising siliceous footwall rocks (VBA), variably grey to green siliceous units (VRH) which carry the highest grades within the shear and contact zones, and foliated hanging-wall sediments (VSED). Two dominant structural orientations were identified at approximately 177°/267° and 238°/328° (Dip/Direction). Gold mineralization is associated with brittle–ductile deformation within shear zones, occurring as quartz veining with K-feldspar and pyrite alteration. Two grade-based domains were modelled (1001 at 0.2 g/t and 1101 at 1.0 g/t Au), with a hard boundary applied between the two; capping was selected within the 98.9–100% percentile range. The Sena MRE replaces the previous Multiple Indicator Kriging (“MIK”) model from December 2024.
Bulk densities were assigned on a weathering basis using values derived from nearby geologically comparable deposits, as no site-specific density measurements were available, with values of 1.65 t/m³ (saprolite), 2.55 t/m³ (saprock) and 2.70 t/m³ (fresh rock).
The US$2,500/oz resource pit shell extends over approximately 900 meters of strike to a maximum depth of around 120 meters.
Diouma North Modelling
The drilling dataset used for the Diouma North MRE comprises 64 RC holes for 6,698 meters and 10 DD holes for 1,579 meters totalling approximately 8,277 meters, complemented by 143 AC scout holes (4,042 meters). All drilling was completed by Montage Gold over 2018–2025 covering the Diouma North and Diouma areas.
Diouma North is located approximately 1 km south of Gbongogo South and is hosted within the same lithological package, comprising mafic volcanics and volcano-sediments cut by an amphibole-bearing gabbro intrusive identical to that at Gbongogo South, plus two texturally distinct diorite intrusives with similar pXRF geochemistry. A quartz-diorite intrusion plunges to the southwest at approximately 75–80° and hosts high-grade mineralization where it interacts with the shear zone. The deposit extends over approximately 780 meters along a NNE trend (~7.5°), modelled as a structurally controlled stacked-lode system through 19 lode domains (1001 to 1019). Drill spacing is approximately 20 m × 20 m for advanced grade control, 40 m × 40 m for resource drilling and greater than 50 m for exploration. The previous 2025 density values were assigned to the current model on a weathering basis (1.64, 2.38 and 2.78 t/bcm were assigned to saprolite, saprock and fresh material respectively).
The US$2,500/oz resource pit shell extends over approximately 790 meters of strike to a maximum depth of around 157 meters.
Petit Yao Modelling
The drilling dataset used for the Petit Yao MRE comprises 122 RC holes for 11,685 meters, 4 DD holes for 569 meters and 7 RD holes for 1,410 meters totalling approximately 13,664 meters, complemented by 102 AC scout holes (4,013 meters) which were not used in the estimation. All drilling was completed by Montage Gold over 2019–2025.
Petit Yao is hosted within foliated volcano-sedimentary rocks adjacent to mafic volcanics, weakly altered felsic intrusives and a gabbro body emplaced parallel to foliation. The structural framework is defined by a sinistral bedding–foliation fabric striking N145° and dipping 52° SW, overprinted by dextral-extensional veining recording three deformation events (D1 regional metamorphism, D2 sinistral strike-slip, D3 dextral strike-slip with extensional stress); the only reliably measured gabbro contact dips along the foliation fabric with a mean plane of N152°/73° SW. Alteration is dominated by silica–sericite ± K-feldspar and sericite–chlorite ± silica developed within mylonitic high-strain corridors. Gold occurs as disseminated pyrite together with two structurally controlled vein sets: (i) intrafolial sheared quartz–carbonate–chlorite–sulphide veins (mean N125°/63° SW) and (ii) shallow extensional quartz–carbonate–tourmaline–sulphide veins (mean N088°/10° SW); the highest grades (greater than 0.5 g/t Au) are concentrated where both vein sets intersect within high-strain corridors, with an approximate mineralized shoot plunge of 17° toward 160° (SE). At least two mineralized zones are recognised at Petit Yao Main with the eastern zone carrying the highest grades and remaining open along strike, down-dip and down-plunge toward the northwest.
Bulk densities of 1.65 t/bcm (saprolite), 2.20 t/bcm (saprock) and 2.80 t/bcm (fresh rock) were assigned based on immersion measurements consistent with those applied to other satellite deposits in the project area.
The US$2,500/oz resource pit shell extends over approximately 1.2 kilometers of strike to a maximum depth of around 180 meters.
ANV Modelling
The drilling dataset compiled for the ANV MRE comprises 299 RC holes for 30,170 meters, 51 DD holes for 8,387 meters and 6 RD holes for 927 meters totalling approximately 39,484 meters, complemented by 38 AC scout holes (1,479 meters). The database includes holes drilled by Endeavour Mining Corporation and predecessor operators as part of historical exploration, as well as recent drilling completed by Montage Gold (287 holes for 27,691 meters of RC, DD and RD drilling plus the AC programme) including the 2024–2026 resource definition programme.
Mineralization is hosted within a structurally controlled, sheared sedimentary–volcaniclastic sequence locally intruded by felsic to intermediate bodies, with gold associated with zones of quartz–carbonate–sulphide veining, silicification and disseminated sulphides developed along the mineralized corridor; the prospect extends over approximately 1.8 kilometres of strike and remains open along strike and at depth. Domain-specific capping thresholds ranged from 5.0 g/t Au to 30.0 g/t Au. Bulk densities of 2.0 t/bcm (saprolite), 2.40 t/bcm (saprock) and 2.80 t/bcm (fresh rock) were assigned based on immersion measurements consistent with those applied to other satellite deposits in the project area.
The US$2,500/oz resource pit shell extends over approximately 1,600 meters of strike to a maximum depth of around 172 meters.
Yeré North Modelling
The drilling dataset used for the Yeré North MRE comprises 81 RC holes for 7,937 meters and 13 DD holes for 2,125 meters totalling approximately 10,062 meters, complemented by 90 AC scout holes (3,471 meters). All drilling was completed by Montage Gold over 2020–2025, covering the Yeré North prospect.
Mineralization is structurally controlled and hosted within a Birimian volcano-sedimentary sequence cut by minor intermediate intrusions, with gold associated with shear-hosted quartz–carbonate–sulphide veining, silicification and disseminated sulphides along the mineralized corridor; the prospect extends over approximately 700 meters of strike and remains open along strike and at depth. Density values from the 2025 Yeré model were assigned to the current model on a weathering basis (bulk densities of 1.60, 2.25 and 2.75 t/bcm were assigned to saprolite, saprock and fresh material respectively on the basis of 110 immersion density measurements).
The US$2,500/oz resource pit shell extends over approximately 580 meters of strike to a maximum depth of around 90 meters.
Lokolo Main Modelling
The Lokolo Main Mineral Resource Estimate is based on a dataset of 254 drillholes totalling approximately 16,558 m, comprising RC, DD and RD drilling, complemented by aircore drilling and trenching used for near-surface geological interpretation. Drilling supports a robust geological interpretation and demonstrates good continuity within the core of the deposit.
Mineralization is hosted within volcano-sedimentary sequences and intrusive contacts, forming structurally controlled sub-parallel lodes associated with brittle–ductile deformation and quartz–carbonate ± sulphide veining. Geological modelling was undertaken using a vein-based approach, guided by structural interpretation, alteration patterns and grade continuity. Drill spacing typically ranges from 25 m × 25 m in advanced areas to >50 m in peripheral zones, supporting appropriate confidence in resource classification.
Bulk densities were assigned on a weathering basis using the immersion (water displacement) method on diamond core samples, with values of 1.60 t/m³ (saprolite), 1.85 t/m³ (saprock) and 2.85 t/m³ (fresh rock).
The US$2,500/oz resource pit shell extends over approximately 1.2 kilometers of strike to a maximum depth of around 110 meters.
Lokolo Northwest modelling
The Lokolo Northwest Mineral Resource Estimate is based on a dataset of 101 drillholes totalling approximately 6,482 m, comprising RC and DD drilling, supplemented by aircore drilling, trenching and pit data used for geological interpretation. The dataset defines a continuation of the Lokolo mineralized system with geological characteristics consistent with Lokolo Main.
Mineralization is hosted within structurally controlled zones associated with intrusive contacts, forming sub-parallel lodes with good lateral and vertical continuity. Geological interpretation and modelling were guided by structural controls, alteration and grade distribution, with mineralized domains defined using appropriate cut-offs to reflect observed continuity. Drill spacing is generally 50 m × 50 m to >50 m, consistent with early-stage resource definition.
Bulk densities were assigned on a weathering basis using the immersion (water displacement) method on diamond core samples, with values of 1.60 t/m³ (saprolite), 2.15 t/m³ (saprock) and 2.70 t/m³ (fresh rock).
The US$2,500/oz resource pit shell extend over approximately 480 meters of strike to a maximum depth of around 140 meters.
Sampling & Assaying – QA/QC
All exploration activities on the Koné project are designed and carried out under the supervision of Silvia Bottero, Executive Vice President, Exploration who conducted multiple site visits throughout 2025 and 2026. Ms. Bottero is a Professional Natural Scientist (SACNASP) and a Qualified Person as defined under NI 43-101.
Samples used for the Updated Mineral Resource Estimate comprise diamond drilling (DD) and reverse circulation (RC) drilling, which form the basis of the resource estimation. Aircore (AC) drilling was used to support the interpretation of near-surface mineralization continuity but was not included in the estimation. All samples were collected, handled and prepared in accordance with industry-standard protocols, ensuring that assay results are representative, reliable and suitable for Mineral Resource estimation. DD core samples were collected as 1 meter downhole composites, consistent with geological logging and sampling protocols. Core was cut longitudinally in half using a diamond saw at the field camp facilities, with one half submitted for assay and the remaining half retained for reference.
RC and AC samples were collected at nominal 1 meter downhole intervals from the cyclone and discharged into sample bags. The bulk sample was passed through a riffle splitter and/or a three-tier riffle splitter (1/3 splitter) to obtain a representative analytical sub-sample, while the remaining material was retained as a coarse reject. Sample weights were monitored to ensure consistency and representativity, with typical analytical sample masses in the order of 2–3 kg, depending on drilling conditions and sample characteristics. Strict sampling protocols were applied, including routine cleaning of the cyclone and splitter, to minimise contamination and ensure sample integrity. All samples were securely transported under chain-of-custody procedures to the Bureau Veritas laboratory in Abidjan, Côte d’Ivoire for preparation and analysis. All samples underwent the following preparation and analytical procedures:
› Crushing to 2 mm (≥ 80% passing)
› Splitting to obtain a 1 kg representative sub-sample
› Pulverisation to 75 μm (≥ 85% passing)
› Analysis by 50 g fire assay with Atomic Absorption Spectrometry (AAS) finish
The analytical method has a lower detection limit of 0.01 ppm Au, which is appropriate for the grade range encountered at the Koné project.
A robust and systematic in-house QA/QC programme was implemented and actively managed by Montage to ensure continuous monitoring of analytical accuracy, precision, and potential contamination throughout the entire sampling, preparation, and analytical workflow. Batch-level QA/QC performance is reviewed systematically, allowing rapid identification and resolution of any analytical issues. To further validate analytical accuracy and laboratory performance, an independent umpire laboratory programme is implemented. Approximately 5% of selected pulp samples are routinely submitted to an external laboratory (MSALABS) for check assaying using internationally recognised analytical methods and QA/QC protocols. The submitted samples include a mix of routine samples, blanks, CRMs, and duplicates to ensure comprehensive verification of results. QA/QC has been designed to be in line with industry best standards and the results reviewed by the Qualified Person. Individual batches are monitored for standard and blank failure during import to the database, whilst longer term QA/QC trends are monitored on a periodic basis by Jonathan Hunt, an independent consultant to Montage and a Chartered Geologist of the Geological Society of London.
Results from the primary laboratory (BV) and the umpire laboratory (MSALAB) are systematically compared using statistical methods (e.g., scatter plots, QQ plots, bias analysis), with no material bias typically identified. In addition, longer-term QA/QC performance trends are reviewed on a periodic basis by an independent consultant, ensuring an objective assessment of laboratory performance and data quality.
Auger drilling: Sampling & Assaying – QA/QC
Auger holes ranged from 0 to 16 meters in depth. Drilled material from each meter was retrieved as the auger was lifted and deposited in plastic containers aligned on ground. For each hole, two 1-meter interval samples were collected: one at the base of the laterite and one on top of the saprolite. Usually, colour and texture changes were obvious indicators of laterite vs saprolite material. The sampled material was mixed and homogenized by shaking the plastic container. An average of 2-kilogram sample was collected by pouring the homogenized material from the container into a labelled sampling plastic bag placed on a weighing scale. Field duplicates were prepared in the field at the same time as the parent sample. A representative chip sample is selected and stored in a plastic chip tray. The remaining homogenized material of the container is poured into another plastic bag having the same label. Both are stored in the camp for geological logging and future reference.
Auger samples were shipped by road to Bureau Veritas facility in Abidjan, Côte d’Ivoire. All samples, including standards, blanks and duplicates were crushed to 2mm (70% passing) with 1 kilogram split out for pulverization to 75μm (85% passing) then analyzed by fire assay solvent extraction, AAS finish, using a 50-gram charge (2 ppb lower detection limit). Field duplicate, blanks and standards are inserted by Montage geologists into the sample sequence at a rate of one of each sample type per 25 samples. This ensures that there is a minimum 4% QA/QC sample insertion rate applied to each fire assay batch. QA/QC has been designed to be in line with industry best standards and to follow NI 43-101 standards and the interpretation reviewed by the Qualified Person. Individual batches are monitored for Standard and Blank failure during import to the database, whilst longer term QA/QC trends are monitored on a periodic basis by Jonathan Hunt, consultant independent of Montage and Chartered Geologist of the Geological Society of London.
Data Verification
Data verification for all satellites deposits was carried out by Rolly Wasonga, a full-time employee as Mineral Resource Manager of Montage Gold, and a Qualified Person as defined under NI 43-101 who conducted multiple site visits throughout 2025 and 2026. Mr. Rolly Wasonga considers that the sample preparation, security, and analytical procedures adopted for drilling informing this release are an adequate basis for the statistical analysis. Procedures implemented to monitor the representativity of field sampling, as well as the reproducibility and accuracy of sample preparation and analytical results for the Koné project (AC, RC and DD drilling), are consistent with industry best practices and the experience of the Qualified Person (QP). Data supporting sample representativity include sample condition logs for RC, aircore and diamond drilling, recovered sample weights, core recovery measurements, and assay results from field duplicates. These controls confirm that sampling is conducted in a manner that is representative of the mineralized material. The reliability of sample preparation and analytical results is supported through the routine insertion and monitoring of quality control samples, including coarse blanks, certified reference materials (standards), and duplicates, demonstrating acceptable levels of accuracy and precision.
In addition, an independent site visit and technical review was conducted by Arethuse Geology in November 2025. Dr. Gregory Zhang visited site in April 2026. Both confirmed that the sampling methodologies, QA/QC procedures, and data management systems are robust, well implemented, and fit for purpose for Mineral Resource estimation.
These independent assessments are complemented by ongoing internal verification by the Company’s Qualified Person, including database validation, QA/QC monitoring, and periodic site reviews. Data verification checks undertaken by Mr. Rolly Wasonga included checking for internal consistency between and within database tables and comparisons between database entries and selected laboratory reports and selected original field records.
FORWARD-LOOKING STATEMENTS
This press release contains certain forward-looking information and forward-looking statements within the meaning of Canadian securities legislation (collectively, “Forward-looking Statements”). All statements, other than statements of historical fact, constitute Forward-looking Statements. Words such as “will”, “intends”, “proposed” and “expects” or similar expressions are intended to identify Forward-looking Statements. Forward-looking Statements in this press release include statements related to the Company’s objectives of achieving first gold pour in late Q4-2026 through an oxide circuit startup; the items listed under the heading “Upcoming Group Catalysts”; the Company’s mineral reserve and resource estimates; results of ongoing and planned exploration and drill programmes; expected recoveries and grades of the Koné project; timing in respect of the completion of construction of various components of the Koné project, the length of construction and of the mining operations at the Koné project, including estimated construction costs; timing and amount of necessary financing related to the mining operations at the Koné project; the timing and amount of future production from the Koné project; anticipated mining and processing methods of the Koné project; anticipated mine life of the Koné project; the publication of new resource estimates and updated LOM Plan and the timing thereof; supplementing the production profile from the onset; any significant return on exploration investment; significant exploration potential; opportunities for further resource growth; and further information related to exploration programmes.
Forward-looking Statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that any Forward-looking Statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements, including that the returns from the Koné project will be lower than estimated, that additions to the mineral resources will not be achieved (including the failure to delineate Petit Yao into a high-grade satellite of scale) or that the remaining cost of construction of the Koné project will be higher than estimated, that the updated LOM plan will indicate lower financial returns or production, or that the acquisition of African Gold will not result in any benefits to Montage. Important factors that could cause actual results to differ materially from include uncertainties inherent in the preparation of mineral reserve and resource estimates and definitive feasibility studies, and in delineating new mineral reserve and resource estimates, including but not limited to, assumptions underlying the production estimates not being realized, incorrect cost assumptions, decreases in the price of gold, unexpected variations in quantity of mineralized material, grade or recovery rates being lower than expected, unexpected adverse changes to geotechnical or hydrogeological considerations, or expectations in that regard not being met, unexpected failures of plant, equipment or processes (including construction equipment), delays in or increased costs for the delivery of construction equipment and services, unexpected changes to availability of power or the power rates, failure to maintain permits and licenses, higher than expected interest or tax rates, adverse changes in project parameters, unanticipated delays and costs of consulting and accommodating rights of local communities, environmental risks inherent in the Côte d’Ivoire, title risks, including failure to renew concessions, unanticipated commodity price and exchange rate fluctuations, delays in or failure to receive access agreements or amended permits, and other risk factors set forth in the Company’s Annual Information Form available at www.sedarplus.ca, under the heading “Risk Factors”. The Company undertakes no obligation to update or revise any Forward-looking Statements, whether as a result of new information, future events or otherwise, except as may be required by law. New factors emerge from time to time, and it is not possible for Montage to predict all of them, or assess the impact of each such factor or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any Forward-looking Statement. Any Forward-looking Statements contained in this press release are expressly qualified in their entirety by this cautionary statement.
APPENDIX A: SATELLITE DEPOSITS CUT-OFF GRADE SENSITIVITIES
Table A1: Gbongogo South Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 9.15 | 0.93 | 274 | 4.03 | 0.78 | 101 | ||
| 0.20 | 8.60 | 0.98 | 271 | 3.74 | 0.83 | 100 | ||
| 0.30 | 7.49 | 1.09 | 263 | 3.13 | 0.94 | 95 | ||
| 0.40 | 6.02 | 1.27 | 246 | 2.32 | 1.14 | 85 | ||
| 0.50 | 4.86 | 1.47 | 230 | 1.76 | 1.41 | 75 | ||
| 0.60 | 4.13 | 1.63 | 217 | 1.27 | 1.68 | 69 | ||
| 0.70 | 3.61 | 1.77 | 205 | 1.08 | 1.87 | 65 | ||
| 0.80 | 3.23 | 1.9 | 197 | 0.97 | 2.01 | 62 | ||
| 0.90 | 2.91 | 2.01 | 188 | 0.86 | 2.14 | 59 | ||
| 1.00 | 2.63 | 2.12 | 179 | 0.80 | 2.23 | 57 | ||
| The Gbonogogo South MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Gbongogo South MRE has an effective date of January 20, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Gbongogo South MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Gbongogo South MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A2: Koban North Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 4.17 | 1.26 | 169 | 0.10 | 0.92 | 3.1 | ||
| 0.20 | 4.17 | 1.26 | 169 | 0.10 | 0.92 | 3.1 | ||
| 0.30 | 4.17 | 1.27 | 170 | 0.10 | 0.92 | 3.1 | ||
| 0.40 | 4.13 | 1.27 | 169 | 0.10 | 0.92 | 3.1 | ||
| 0.50 | 4.02 | 1.30 | 168 | 0.10 | 0.95 | 2.9 | ||
| 0.60 | 3.76 | 1.35 | 163 | 0.07 | 1.15 | 2.4 | ||
| 0.70 | 3.44 | 1.41 | 156 | 0.06 | 1.24 | 2.2 | ||
| 0.80 | 3.09 | 1.49 | 148 | 0.05 | 1.31 | 2.0 | ||
| 0.90 | 2.78 | 1.56 | 140 | 0.04 | 1.36 | 1.9 | ||
| 1.00 | 2.47 | 1.64 | 130 | 0.04 | 1.41 | 1.8 | ||
| The Koban North MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Koban North MRE has an effective date of November 28, 2025, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Koban North MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Koban North MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A3: Soman Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 3.56 | 0.73 | 84 | 3.44 | 0.71 | 79 | ||
| 0.20 | 3.52 | 0.74 | 83 | 3.37 | 0.72 | 78 | ||
| 0.30 | 2.91 | 0.84 | 78 | 2.85 | 0.81 | 74 | ||
| 0.40 | 1.89 | 1.10 | 67 | 2.10 | 0.97 | 66 | ||
| 0.50 | 1.27 | 1.42 | 58 | 1.54 | 1.16 | 57 | ||
| 0.60 | 0.93 | 1.73 | 52 | 1.12 | 1.39 | 50 | ||
| 0.70 | 0.74 | 2.02 | 48 | 0.88 | 1.59 | 45 | ||
| 0.80 | 0.63 | 2.23 | 46 | 0.73 | 1.77 | 42 | ||
| 0.90 | 0.63 | 2.23 | 46 | 0.73 | 1.77 | 42 | ||
| 1.00 | 0.53 | 2.49 | 43 | 0.53 | 2.09 | 36 | ||
| The Soman MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Soman MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Soman MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Soman MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A4: Sena Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 1.37 | 0.80 | 35 | 2.94 | 0.82 | 78 | ||
| 0.20 | 1.36 | 0.81 | 35 | 2.76 | 0.86 | 77 | ||
| 0.30 | 1.15 | 0.91 | 33 | 2.26 | 1.00 | 72 | ||
| 0.40 | 0.59 | 1.43 | 27 | 1.13 | 1.64 | 60 | ||
| 0.50 | 0.36 | 2.06 | 24 | 0.70 | 2.36 | 54 | ||
| 0.60 | 0.35 | 2.10 | 24 | 0.64 | 2.54 | 52 | ||
| 0.70 | 0.35 | 2.10 | 24 | 0.64 | 2.54 | 52 | ||
| 0.80 | 0.35 | 2.10 | 24 | 0.64 | 2.54 | 52 | ||
| 0.90 | 0.35 | 2.10 | 24 | 0.64 | 2.54 | 52 | ||
| 1.00 | 0.35 | 2.10 | 24 | 0.64 | 2.54 | 52 | ||
| The Sena MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Sena MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Sena MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Sena MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A5: Diouma North Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 1.39 | 1.06 | 47 | 0.84 | 0.91 | 25 | ||
| 0.20 | 1.35 | 1.09 | 47 | 0.81 | 0.94 | 24 | ||
| 0.30 | 1.25 | 1.16 | 47 | 0.73 | 1.02 | 24 | ||
| 0.40 | 1.13 | 1.24 | 45 | 0.63 | 1.12 | 23 | ||
| 0.50 | 1.02 | 1.33 | 43 | 0.55 | 1.22 | 22 | ||
| 0.60 | 0.91 | 1.43 | 42 | 0.49 | 1.3 | 20 | ||
| 0.70 | 0.82 | 1.51 | 40 | 0.42 | 1.4 | 19 | ||
| 0.80 | 0.73 | 1.61 | 38 | 0.33 | 1.58 | 17 | ||
| 0.90 | 0.63 | 1.73 | 35 | 0.29 | 1.69 | 16 | ||
| 1.00 | 0.55 | 1.85 | 32 | 0.26 | 1.78 | 15 | ||
| The Diouma North MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Diouma North MRE has an effective date of January 20, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Diouma North MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Diouma North MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A6: Petit Yao Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 4.61 | 0.89 | 132 | 16.51 | 0.90 | 478 | ||
| 0.20 | 4.59 | 0.89 | 131 | 16.40 | 0.90 | 475 | ||
| 0.30 | 4.32 | 0.93 | 129 | 15.53 | 0.94 | 469 | ||
| 0.40 | 3.04 | 1.17 | 114 | 12.40 | 1.09 | 435 | ||
| 0.50 | 2.09 | 1.51 | 102 | 9.50 | 1.28 | 391 | ||
| 0.60 | 1.72 | 1.72 | 95 | 7.95 | 1.42 | 363 | ||
| 0.70 | 1.55 | 1.83 | 91 | 7.05 | 1.52 | 345 | ||
| 0.80 | 1.46 | 1.90 | 89 | 6.31 | 1.61 | 327 | ||
| 0.90 | 1.38 | 1.96 | 87 | 5.83 | 1.68 | 315 | ||
| 1.00 | 1.32 | 2.00 | 85 | 5.29 | 1.75 | 298 | ||
| The Petit Yao MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Petit Yao MRE has an effective date of January 20, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Petit Yao MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Petit Yao MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A7: ANV Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 8.04 | 0.82 | 212 | 5.07 | 0.65 | 106 | ||
| 0.20 | 6.00 | 1.05 | 202 | 2.83 | 1.06 | 97 | ||
| 0.30 | 4.70 | 1.27 | 192 | 2.09 | 1.34 | 90 | ||
| 0.40 | 3.69 | 1.52 | 180 | 1.62 | 1.64 | 85 | ||
| 0.50 | 3.16 | 1.71 | 174 | 1.36 | 1.86 | 81 | ||
| 0.60 | 2.86 | 1.83 | 168 | 1.24 | 1.99 | 79 | ||
| 0.70 | 2.69 | 1.90 | 164 | 1.15 | 2.10 | 78 | ||
| 0.80 | 2.54 | 1.97 | 161 | 1.07 | 2.19 | 75 | ||
| 0.90 | 2.38 | 2.04 | 156 | 0.99 | 2.30 | 73 | ||
| 1.00 | 2.22 | 2.12 | 151 | 0.93 | 2.40 | 71 | ||
| The ANV MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The ANV MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.60 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The ANV MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The ANV MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A8: Yeré North Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 1.00 | 1.10 | 35 | 0.26 | 0.65 | 5.5 | ||
| 0.20 | 1.00 | 1.10 | 35 | 0.26 | 0.65 | 5.5 | ||
| 0.30 | 0.98 | 1.12 | 35 | 0.23 | 0.71 | 5.1 | ||
| 0.40 | 0.76 | 1.34 | 33 | 0.13 | 0.97 | 4.1 | ||
| 0.50 | 0.53 | 1.73 | 29 | 0.11 | 1.09 | 3.8 | ||
| 0.60 | 0.42 | 2.03 | 28 | 0.07 | 1.39 | 3.1 | ||
| 0.70 | 0.39 | 2.13 | 27 | 0.05 | 1.68 | 2.7 | ||
| 0.80 | 0.37 | 2.19 | 26 | 0.05 | 1.70 | 2.6 | ||
| 0.90 | 0.35 | 2.31 | 26 | 0.04 | 1.85 | 2.4 | ||
| 1.00 | 0.33 | 2.38 | 25 | 0.04 | 1.87 | 2.4 | ||
| The Yeré North MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Yeré North MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.60 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Yeré North MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Yeré North MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A9: Lokolo Main Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 0.51 | 1.91 | 31 | 0.92 | 0.78 | 23 | ||
| 0.20 | 0.51 | 1.91 | 31 | 0.92 | 0.78 | 23 | ||
| 0.30 | 0.51 | 1.91 | 31 | 0.92 | 0.78 | 23 | ||
| 0.40 | 0.51 | 1.91 | 31 | 0.91 | 0.78 | 23 | ||
| 0.50 | 0.50 | 1.92 | 31 | 0.83 | 0.82 | 22 | ||
| 0.60 | 0.49 | 1.94 | 31 | 0.58 | 0.93 | 17 | ||
| 0.70 | 0.48 | 1.98 | 31 | 0.40 | 1.05 | 13 | ||
| 0.80 | 0.45 | 2.06 | 30 | 0.34 | 1.11 | 12 | ||
| 0.90 | 0.41 | 2.17 | 29 | 0.26 | 1.18 | 10 | ||
| 1.00 | 0.39 | 2.25 | 28 | 0.19 | 1.27 | 8 | ||
| Lokolo Main MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Lokolo Main MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Lokolo Main MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Lokolo Main MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
Table A10: Lokolo Northwest Mineral Resource Estimate cut-off grade sensitivity at US$2,500/oz
| INDICATED | INFERRED | |||||||
| Cut-off Au g/t |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
Tonnage (Mt) |
Grade (Au g/t) |
Content (Au koz) |
||
| 0.10 | 0.95 | 0.96 | 29 | 0.54 | 1.14 | 20 | ||
| 0.20 | 0.95 | 0.96 | 29 | 0.54 | 1.14 | 20 | ||
| 0.30 | 0.92 | 0.98 | 29 | 0.54 | 1.15 | 20 | ||
| 0.40 | 0.85 | 1.03 | 29 | 0.51 | 1.18 | 20 | ||
| 0.50 | 0.76 | 1.10 | 27 | 0.49 | 1.22 | 19 | ||
| 0.60 | 0.65 | 1.19 | 26 | 0.44 | 1.29 | 18 | ||
| 0.70 | 0.53 | 1.31 | 25 | 0.36 | 1.42 | 17 | ||
| 0.80 | 0.41 | 1.48 | 22 | 0.28 | 1.64 | 15 | ||
| 0.90 | 0.35 | 1.60 | 20 | 0.25 | 1.72 | 14 | ||
| 1.00 | 0.27 | 1.79 | 15 | 0.22 | 1.82 | 13 | ||
| Lokolo Northwest MRE is reported in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) and follows the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”) Definition Standards for Mineral Resources. The Lokolo Northwest MRE has an effective date of April 15, 2026, and is reported at a gold cut-off grade of 0.50 g/t Au and is constrained within an optimized open-pit shell generated using a gold price of US$2,500 per ounce. The Lokolo Northwest MRE was prepared by Mr. Rolly Wasonga, Qualified Person and employee of Montage, and reviewed by Dr. Gregory Zhang, employee of Snowden Optiro, Australia, who is independent from Montage and a Qualified Person as defined by NI 43-101. The Lokolo Northwest MRE is reported on a 100% basis. Rounding errors are apparent. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. See “Technical Disclosure” above for details. | ||||||||
APPENDIX B: KONÉ PROJECT BEST INTERCEPTS FOR SATELLITE DEPOSITS1
| Target | Hole ID | Drill Type | Collar Location | Orientation | Length (m) | From (m) | To (m) | Apparent Width1 | Grade Uncut | Comments | |||
| (UTM Zone 29N) | |||||||||||||
| m E | m N | mRL | Dip | Azim | |||||||||
| ANV | SDRC0254 | RC | 782,972 | 1,015,175 | 438 | -55 | 125 | 96 | 27 | 40 | 13.0 | 1.77 | |
| SDRC0279 | RC | 782,962 | 1,014,579 | 427 | -55 | 125 | 105 | 94 | 98 | 4.0 | 3.46 | ||
| SDRC0280 | RC | 782,922 | 1,014,609 | 427 | -55 | 125 | 96 | 66 | 72 | 6.0 | 2.71 | ||
| SDRC0280 | RC | 782,922 | 1,014,609 | 427 | -55 | 125 | 96 | 80 | 87 | 7.0 | 4.83 | Incl. 1m @ 16.58 g/t from 82m | |
| SDRC0281 | RC | 782,884 | 1,014,637 | 427 | -55 | 125 | 87 | 6 | 13 | 7.0 | 2.85 | Incl. 1m @ 17.04 g/t from 11m | |
| SDRC0285 | RC | 781,990 | 1,014,207 | 411 | -55 | 125 | 90 | 2 | 4 | 2.0 | 1.19 | ||
| SDRC0285 | RC | 781,990 | 1,014,207 | 411 | -55 | 125 | 90 | 56 | 60 | 4.0 | 5.87 | ||
| SDRC0285 | RC | 781,990 | 1,014,207 | 411 | -55 | 125 | 90 | 71 | 73 | 2.0 | 1.15 | ||
| SDRC0299 | RC | 782,922 | 1,015,093 | 433 | -55 | 125 | 90 | 3 | 14 | 11.0 | 2.12 | ||
| SDRC0305 | RC | 783,188 | 1,015,211 | 436 | -55 | 125 | 90 | 10 | 12 | 2.0 | 2.17 | ||
| SDRC0306 | RC | 783,147 | 1,015,239 | 436 | -55 | 125 | 90 | 10 | 17 | 7.0 | 2.14 | ||
| SDRC0306 | RC | 783,147 | 1,015,239 | 436 | -55 | 125 | 90 | 49 | 52 | 3.0 | 1.25 | ||
| ANV West | RSDRC0318 | RC | 782,081 | 1,015,316 | 437 | -55 | 90 | 79 | 67 | 74 | 7.0 | 5.86 | Incl. 1m @ 27.96 g/t from 69m |
| RSDRC0321 | RC | 782,240 | 1,015,608 | 444 | -55 | 90 | 97 | 57 | 59 | 2.0 | 1.90 | ||
| Bafretou 2 | BF2AC0035 | AC | 759,654 | 970,972 | 392 | -55 | 120 | 35 | 24 | 27 | 3.0 | 2.08 | |
| Gbongogo South | GBRC478 | RC | 769,133 | 992,523 | 333 | -55 | 90 | 117 | 21 | 26 | 5.0 | 2.65 | |
| GBRC478 | RC | 769,133 | 992,523 | 333 | -55 | 90 | 117 | 93 | 95 | 2.0 | 3.96 | ||
| GBRC478 | RC | 769,133 | 992,523 | 333 | -55 | 90 | 117 | 102 | 114 | 12.0 | 1.55 | ||
| GBRC482 | RC | 769,047 | 992,472 | 331 | -55 | 90 | 114 | 39 | 42 | 3.0 | 1.12 | ||
| GBRC482 | RC | 769,047 | 992,472 | 331 | -55 | 90 | 114 | 107 | 109 | 2.0 | 11.78 | Incl. 1m @ 15.05 g/t from 107m | |
| GBRC0484 | RC | 769,083 | 992,574 | 329 | -55 | 90 | 237 | 0 | 5 | 5.0 | 2.14 | ||
| GBRC0484 | RC | 769,083 | 992,574 | 329 | -55 | 90 | 237 | 148 | 160 | 12.0 | 2.52 | ||
| GBRC0485 | RC | 769,124 | 992,549 | 340 | -55 | 90 | 220 | 132 | 136 | 4.0 | 2.81 | ||
| GBRC0485 | RC | 769,124 | 992,549 | 340 | -55 | 90 | 220 | 156 | 158 | 2.0 | 4.41 | ||
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 165 | 173 | 8.0 | 5.09 | Incl. 1m @ 12.31 g/t from 169m; 1m @ 17.36 g/t from 170m | |
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 177 | 190 | 13.0 | 3.50 | Incl. 1m @ 25.99 g/t from 185m | |
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 198 | 200 | 2.0 | 3.02 | ||
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 208 | 211 | 3.0 | 3.86 | ||
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 218 | 221 | 3.0 | 1.80 | ||
| GBRC0486 | RC | 769,035 | 992,624 | 347 | -55 | 90 | 250 | 235 | 238 | 3.0 | 1.51 | ||
| GBRC0487 | RC | 769,043 | 992,675 | 365 | -55 | 90 | 286 | 131 | 133 | 2.0 | 1.48 | ||
| GBRC0487 | RC | 769,043 | 992,675 | 365 | -55 | 90 | 286 | 202 | 214 | 12.0 | 1.18 | ||
| GBRC0487 | RC | 769,043 | 992,675 | 365 | -55 | 90 | 286 | 256 | 259 | 3.0 | 2.94 | ||
| GBSRC0490 | RC | 768,985 | 992,624 | 334 | -55 | 90 | 296 | 217 | 220 | 3.0 | 1.96 | ||
| GBSRC0490 | RC | 768,985 | 992,624 | 334 | -55 | 90 | 296 | 246 | 250 | 4.0 | 2.00 | ||
| GBSRC0490 | RC | 768,985 | 992,624 | 334 | -55 | 90 | 296 | 253 | 255 | 2.0 | 9.51 | Incl. 1m @ 15.15 g/t from 253m | |
| GBSRC0490 | RC | 768,985 | 992,624 | 334 | -55 | 90 | 296 | 265 | 267 | 2.0 | 1.64 | ||
| GBSRC0493 | RC | 768,995 | 992,675 | 335 | -55 | 90 | 296 | 7 | 9 | 2.0 | 1.06 | ||
| GBSRC0493 | RC | 768,995 | 992,675 | 335 | -55 | 90 | 296 | 52 | 54 | 2.0 | 3.82 | ||
| GBSRC0493 | RC | 768,995 | 992,675 | 335 | -55 | 90 | 296 | 150 | 161 | 11.0 | 1.09 | ||
| GBSRC0493 | RC | 768,995 | 992,675 | 335 | -55 | 90 | 296 | 265 | 267 | 2.0 | 4.62 | ||
| GBSRC0493 | RC | 768,995 | 992,675 | 335 | -55 | 90 | 296 | 294 | 296 | 2.0 | 1.31 | ||
| GBSRC0497 | RC | 768,654 | 992,247 | 325 | -55 | 90 | 84 | 18 | 23 | 5.0 | 2.04 | ||
| GBSRC0497 | RC | 768,654 | 992,247 | 325 | -55 | 90 | 84 | 54 | 58 | 4.0 | 1.10 | ||
| GBSRC0497 | RC | 768,654 | 992,247 | 325 | -55 | 90 | 84 | 77 | 80 | 3.0 | 2.22 | ||
| GBSRC0503A | RC | 769,059 | 992,748 | 338 | -55 | 90 | 280 | 8 | 12 | 4.0 | 1.04 | ||
| GBSRC0503A | RC | 769,059 | 992,748 | 338 | -55 | 90 | 280 | 21 | 24 | 3.0 | 3.56 | ||
| GBSRC0503A | RC | 769,059 | 992,748 | 338 | -55 | 90 | 280 | 40 | 57 | 17.0 | 1.10 | ||
| GBSRC0503A | RC | 769,059 | 992,748 | 338 | -55 | 90 | 280 | 74 | 76 | 2.0 | 1.60 | ||
| GBSRC0503A | RC | 769,059 | 992,748 | 338 | -55 | 90 | 280 | 185 | 188 | 3.0 | 2.15 | ||
| GBSRC0504 | RC | 769,088 | 992,821 | 340 | -55 | 90 | 229 | 8 | 10 | 2.0 | 2.34 | ||
| GBSRC0504 | RC | 769,088 | 992,821 | 340 | -55 | 90 | 229 | 29 | 32 | 3.0 | 1.91 | ||
| GBSRC0504 | RC | 769,088 | 992,821 | 340 | -55 | 90 | 229 | 211 | 214 | 3.0 | 1.76 | ||
| GBSRC0505A | RC | 769,068 | 992,854 | 341 | -55 | 90 | 230 | 25 | 27 | 2.0 | 3.79 | ||
| GBSRC0505A | RC | 769,068 | 992,854 | 341 | -55 | 90 | 230 | 108 | 116 | 8.0 | 1.55 | ||
| GBSRC0506 | RC | 769,114 | 992,854 | 342 | -55 | 90 | 229 | 26 | 29 | 3.0 | 4.11 | Incl. 1m @ 10.58 g/t from 26m | |
| GBSRC0506 | RC | 769,114 | 992,854 | 342 | -55 | 90 | 229 | 33 | 39 | 6.0 | 2.66 | ||
| GBSRC0506 | RC | 769,114 | 992,854 | 342 | -55 | 90 | 229 | 175 | 179 | 4.0 | 1.06 | ||
| GBSRC0508 | RC | 769,109 | 992,797 | 340 | -55 | 90 | 200 | 0 | 7 | 7.0 | 1.50 | ||
| GBSRC0508 | RC | 769,109 | 992,797 | 340 | -55 | 90 | 200 | 15 | 18 | 3.0 | 1.19 | ||
| GBSRC0508 | RC | 769,109 | 992,797 | 340 | -55 | 90 | 200 | 23 | 25 | 2.0 | 2.89 | ||
| GBSRC0508 | RC | 769,109 | 992,797 | 340 | -55 | 90 | 200 | 28 | 36 | 8.0 | 4.23 | Incl. 1m @ 14.81 g/t from 29m | |
| GBSRC0508 | RC | 769,109 | 992,797 | 340 | -55 | 90 | 200 | 132 | 136 | 4.0 | 1.05 | ||
| GBSRC0509 | RC | 769,161 | 992,900 | 343 | -55 | 90 | 151 | 6 | 10 | 4.0 | 4.71 | Incl. 1m @ 11.39 g/t from 7m | |
| GBSRC0509 | RC | 769,161 | 992,900 | 343 | -55 | 90 | 151 | 44 | 46 | 2.0 | 1.02 | ||
| GBSRC0511 | RC | 768,994 | 992,525 | 330 | -55 | 90 | 220 | 152 | 157 | 5.0 | 1.50 | ||
| GBSRC0511 | RC | 768,994 | 992,525 | 330 | -55 | 90 | 220 | 162 | 164 | 2.0 | 6.92 | Incl. 1m @ 10.89 g/t from 163m | |
| GBSRC0511 | RC | 768,994 | 992,525 | 330 | -55 | 90 | 220 | 209 | 212 | 3.0 | 1.31 | ||
| GBSRC0512 | RC | 769,072 | 992,621 | 334 | -55 | 90 | 230 | 130 | 133 | 3.0 | 1.00 | ||
| GBSRC0512 | RC | 769,072 | 992,621 | 334 | -55 | 90 | 230 | 180 | 185 | 5.0 | 2.04 | ||
| GBSRC0512 | RC | 769,072 | 992,621 | 334 | -55 | 90 | 230 | 202 | 206 | 4.0 | 4.64 | ||
| GBSRC0513 | RC | 769,066 | 992,774 | 339 | -55 | 90 | 230 | 167 | 173 | 6.0 | 1.95 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 54 | 58 | 4.0 | 1.56 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 82 | 84 | 2.0 | 3.07 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 111 | 113 | 2.0 | 1.23 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 138 | 142 | 4.0 | 2.48 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 212 | 214 | 2.0 | 1.08 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 228 | 232 | 4.0 | 1.50 | ||
| GBSRC0514 | RC | 769,061 | 992,799 | 339 | -55 | 90 | 260 | 241 | 246 | 5.0 | 1.75 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 23 | 26 | 3.0 | 1.97 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 57 | 59 | 2.0 | 1.23 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 108 | 110 | 2.0 | 1.27 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 139 | 144 | 5.0 | 1.22 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 177 | 179 | 2.0 | 2.65 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 201 | 207 | 6.0 | 1.93 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 250 | 257 | 7.0 | 2.07 | ||
| GBSRC0515 | RC | 769,008 | 992,749 | 338 | -55 | 90 | 302 | 269 | 271 | 2.0 | 2.66 | ||
| Koban North | KBNDD005 | Core | 769,984 | 1,000,637 | 396 | -55 | 105 | 154 | 18 | 25 | 7.0 | 1.64 | |
| KBNDD005 | Core | 769,984 | 1,000,637 | 396 | -55 | 105 | 154 | 39.8 | 43.8 | 4.0 | 2.85 | ||
| KBNDD005 | Core | 769,984 | 1,000,637 | 396 | -55 | 105 | 154 | 103 | 109 | 5.3 | 1.22 | ||
| KBNDD005 | Core | 769,984 | 1,000,637 | 396 | -55 | 105 | 154 | 125 | 129 | 4.0 | 1.83 | ||
| KBNDD008 | Core | 769,970 | 1,000,485 | 393 | -55.4 | 105.1 | 174.65 | 10 | 16 | 6.0 | 1.74 | ||
| KBNDD008 | Core | 769,970 | 1,000,485 | 393 | -55.4 | 105.1 | 174.65 | 57 | 59 | 2.0 | 2.25 | ||
| KBNDD008 | Core | 769,970 | 1,000,485 | 393 | -55.4 | 105.1 | 174.65 | 116 | 131 | 14.5 | 1.65 | ||
| KBNDD017 | Core | 769,982 | 1,000,790 | 399 | -55 | 105 | 160.9 | 20 | 23 | 2.6 | 1.29 | ||
| KBNDD017 | Core | 769,982 | 1,000,790 | 399 | -55 | 105 | 160.9 | 130 | 133 | 3.0 | 8.35 | Incl. 1m @ 23.28 g/t from 130m | |
| KBNRC0120 | RC | 769,986 | 1,000,814 | 399 | -55 | 105 | 240 | 25 | 31 | 6.0 | 1.14 | ||
| KBNRC0120 | RC | 769,986 | 1,000,814 | 399 | -55 | 105 | 240 | 76 | 78 | 2.0 | 2.00 | ||
| KBNRC0120 | RC | 769,986 | 1,000,814 | 399 | -55 | 105 | 240 | 126 | 131 | 5.0 | 1.86 | ||
| KBNRC0120 | RC | 769,986 | 1,000,814 | 399 | -55 | 105 | 240 | 212 | 216 | 4.0 | 1.82 | ||
| KBNRC0135 | RC | 770,487 | 1,000,593 | 400 | -55 | 105 | 96 | 7 | 9 | 2.0 | 1.86 | ||
| KBNRC094 | RC | 769,964 | 1,000,512 | 393 | -55 | 105 | 160 | 60 | 69 | 9.0 | 1.92 | ||
| KBNRC094 | RC | 769,964 | 1,000,512 | 393 | -55 | 105 | 160 | 135 | 140 | 5.0 | 1.20 | ||
| KBNRC095 | RC | 770,151 | 1,000,745 | 400 | -55 | 105 | 140 | 41 | 48 | 7.0 | 1.17 | ||
| KBNRC095 | RC | 770,151 | 1,000,745 | 400 | -55 | 105 | 140 | 83 | 85 | 2.0 | 2.08 | ||
| KBNRC097 | RC | 770,214 | 1,000,731 | 402 | -55 | 105 | 75 | 16 | 23 | 7.0 | 3.67 | Incl. 1m @ 16.45 g/t from 16m | |
| KBNRC099 | RC | 770,067 | 1,000,303 | 391 | -55 | 105 | 52 | 18 | 28 | 10.0 | 5.42 | Incl. 1m @ 17.68 g/t from 20m; Incl. 1m @ 14.94 g/t from 21m | |
| KBNRC100 | RC | 770,021 | 1,000,367 | 392 | -55 | 105 | 110 | 11 | 16 | 5.0 | 2.30 | ||
| KBNRC108 | RC | 769,965 | 1,000,667 | 397 | -55 | 105 | 156 | 40 | 42 | 2.0 | 1.77 | ||
| KBNRC110 | RC | 769,967 | 1,000,769 | 398 | -55 | 105 | 150 | 44 | 47 | 3.0 | 2.72 | ||
| KBNRC110 | RC | 769,967 | 1,000,769 | 398 | -55 | 105 | 150 | 86 | 88 | 2.0 | 6.52 | ||
| KBNRD106 | RD | 769,927 | 1,000,676 | 397 | -55 | 105 | 215.7 | 85 | 90 | 5.0 | 1.93 | ||
| KBNRD109 | RD | 769,981 | 1,000,688 | 397 | -55 | 105 | 179.7 | 60 | 68 | 8.0 | 1.87 | ||
| KBNRD109 | RD | 769,981 | 1,000,688 | 397 | -55 | 105 | 179.7 | 153 | 155 | 2.3 | 1.72 | ||
| Lokolo Main | LKMAC0018 | AC | 778,877 | 989,986 | 347 | -55 | 315 | 39 | 14 | 21 | 7.0 | 2.13 | Incl. 1m @ 10.82 g/t from 15m |
| LKMAC0024 | AC | 779,050 | 990,016 | 351 | -55 | 315 | 33 | 22 | 24 | 2.0 | 5.90 | Incl. 1m @ 11.27 g/t from 22m | |
| LKMAC0025 | AC | 779,041 | 990,025 | 351 | -55 | 315 | 30 | 10 | 13 | 3.0 | 5.30 | Incl. 1m @ 15.07 g/t from 10m | |
| Lokolo Main North | LKMNAC035 | AC | 779,972 | 990,725 | 363 | -55 | 315 | 27 | 11 | 13 | 2.0 | 3.26 | |
| LKMNAC037 | AC | 779,952 | 990,743 | 363 | -55 | 315 | 33 | 18 | 23 | 5.0 | 3.17 | Incl. 1m @ 11.51 g/t from 20m | |
| Lokolo Main Northwest | LKNWAC0013 | AC | 777,044 | 990,817 | 376 | -55 | 315 | 46 | 34 | 45 | 11.0 | 1.80 | |
| LKNWRC016 | RC | 776,867 | 990,565 | 383 | -55 | 315 | 138 | 0 | 23 | 23.0 | 2.06 | Incl. 1m @ 23.99 g/t from 22m | |
| LKNWRC017 | RC | 776,927 | 990,610 | 382 | -55 | 315 | 134 | 12 | 20 | 8.0 | 7.93 | Incl. 1m @ 43.15 g/t from 12m | |
| LKNWRC017 | RC | 776,927 | 990,610 | 382 | -55 | 315 | 134 | 95 | 98 | 3.0 | 2.08 | ||
| LKNWRC023 | RC | 777,001 | 990,675 | 380 | -55 | 315 | 138 | 45 | 49 | 4.0 | 2.13 | ||
| LKNWRC023 | RC | 777,001 | 990,675 | 380 | -55 | 315 | 138 | 106 | 114 | 8.0 | 2.36 | ||
| LKNWRC023 | RC | 777,001 | 990,675 | 380 | -55 | 315 | 138 | 118 | 121 | 3.0 | 1.86 | ||
| LKNWRC023 | RC | 777,001 | 990,675 | 380 | -55 | 315 | 138 | 131 | 135 | 4.0 | 1.75 | ||
| LKNWRC024 | RC | 776,932 | 990,746 | 378 | -55 | 315 | 60 | 22 | 25 | 3.0 | 2.58 | ||
| LKNWRC028 | RC | 776,856 | 990,670 | 381 | -55 | 315 | 60 | 22 | 36 | 14.0 | 2.50 | Incl. 1m @ 23.59 g/t from 29m | |
| LKNWRC029 | RC | 776,843 | 990,593 | 383 | -55 | 315 | 100 | 62 | 66 | 4.0 | 7.21 | Incl. 1m @ 25.04 g/t from 63m | |
| LKNWRC032 | RC | 776,847 | 990,548 | 386 | -55 | 315 | 132 | 34 | 41 | 7.0 | 2.08 | ||
| LKNWRC032 | RC | 776,847 | 990,548 | 386 | -55 | 315 | 132 | 93 | 96 | 3.0 | 1.04 | ||
| Lokolo South | LKSRC002 | RC | 775,487 | 987,111 | 361 | -55 | 315 | 84 | 58 | 61 | 3.0 | 1.81 | |
| Petit Yao | PYRC0044 | RC | 764,840 | 964,531 | 361 | -60 | 40 | 136 | 5 | 11 | 6.0 | 1.89 | |
| PYRC0044 | RC | 764,840 | 964,531 | 361 | -60 | 40 | 136 | 112 | 115 | 3.0 | 1.72 | ||
| PYRC0054 | RC | 765,155 | 964,443 | 368 | -60 | 40 | 75 | 26 | 29 | 3.0 | 2.14 | ||
| PYRC0054 | RC | 765,155 | 964,443 | 368 | -60 | 40 | 75 | 67 | 69 | 2.0 | 1.66 | ||
| PYRC0061 | RC | 764,778 | 964,536 | 440 | -60 | 40 | 153 | 127 | 129 | 2.0 | 31.53 | Incl. 1m @ 60.43 g/t from 127m | |
| PYRC0064 | RC | 764,578 | 964,609 | 348 | -60 | 40 | 202 | 39 | 42 | 3.0 | 6.87 | Incl. 1m @ 18.95 g/t from 40m | |
| PYRC0066 | RC | 764,671 | 964,557 | 340 | -60 | 40 | 238 | 32 | 34 | 2.0 | 3.09 | ||
| PYRC0069 | RC | 765,063 | 964,331 | 342 | -60 | 40 | 139 | 119 | 129 | 10.0 | 1.89 | ||
| PYRC0073A | RC | 765,220 | 964,206 | 338 | -60 | 40 | 136 | 51 | 63 | 12.0 | 2.57 | Incl. 1m @ 18.47 g/t from 61m | |
| PYRC0083 | RC | 765,123 | 964,476 | 343 | -60 | 40 | 108 | 66 | 70 | 4.0 | 4.39 | Incl. 1m @ 13.58 g/t from 67m | |
| PYRC0085 | RC | 765,062 | 964,402 | 341 | -60 | 40 | 87 | 69 | 72 | 3.0 | 2.07 | ||
| PYRC0087 | RC | 765,129 | 964,405 | 341 | -60 | 40 | 110 | 100 | 103 | 3.0 | 3.00 | ||
| PYRD0047 | RC-DD | 764,651 | 964,694 | 356 | -60 | 40 | 207.9 | 67 | 71 | 4.0 | 6.72 | Incl. 1m @ 16.10 g/t from 68m | |
| PYRD0047 | RC-DD | 764,651 | 964,694 | 356 | -60 | 40 | 207.9 | 153 | 157 | 4.0 | 1.00 | ||
| PYRC0101 | RC | 765,386 | 964,169 | 346 | -60 | 40 | 48 | 15 | 17 | 2.0 | 2.48 | ||
| PYRC0103 | RC | 765,291 | 964,059 | 336 | -60 | 40 | 86 | 10 | 12 | 2.0 | 2.65 | ||
| PYRC0115 | RC | 765,371 | 963,919 | 348 | -60 | 40 | 120 | 94 | 99 | 5.0 | 1.82 | ||
| Soman 1 | GBDDH099 | Core | 770,202 | 994,041 | 341 | -55 | 140 | 170.8 | 19 | 29 | 10.5 | 1.00 | |
| GBDDH099 | Core | 770,202 | 994,041 | 341 | -55 | 140 | 170.8 | 42 | 44 | 2.0 | 1.52 | ||
| GBDDH099 | Core | 770,202 | 994,041 | 341 | -55 | 140 | 170.8 | 97 | 101 | 3.5 | 1.35 | ||
| GBDDH099 | Core | 770,202 | 994,041 | 341 | -55 | 140 | 170.8 | 110 | 113 | 3.5 | 1.11 | ||
| GBDDH099 | Core | 770,202 | 994,041 | 341 | -55 | 140 | 170.8 | 138 | 146 | 8.0 | 1.86 | ||
| GBDDH101 | Core | 770,249 | 994,099 | 344 | -55 | 140 | 140.6 | 43 | 45 | 2.5 | 6.40 | Incl. 0.5m @ 26.01 g/t from 43.6m | |
| GBDDH101 | Core | 770,249 | 994,099 | 344 | -55 | 140 | 140.6 | 82 | 85 | 3.0 | 2.18 | ||
| GBDDH101 | Core | 770,249 | 994,099 | 344 | -55 | 140 | 140.6 | 103 | 105 | 2.0 | 2.98 | ||
| SORC0057 | RC | 770,258 | 993,931 | 338 | -55 | 140 | 108 | 5 | 9 | 4.0 | 1.32 | ||
| SORC0057 | RC | 770,258 | 993,931 | 338 | -55 | 140 | 108 | 18 | 20 | 2.0 | 1.62 | ||
| SORC0057 | RC | 770,258 | 993,931 | 338 | -55 | 140 | 108 | 41 | 46 | 5.0 | 1.95 | ||
| SORC0059 | RC | 770,292 | 993,973 | 342 | -55 | 140 | 110 | 1 | 8 | 7.0 | 1.99 | ||
| SORC0059 | RC | 770,292 | 993,973 | 342 | -55 | 140 | 110 | 28 | 33 | 5.0 | 1.23 | ||
| SORC0061 | RC | 770,318 | 994,021 | 354 | -55 | 140 | 75 | 44 | 51 | 7.0 | 2.37 | ||
| SORC0063 | RC | 770,163 | 994,116 | 347 | -55 | 140 | 194 | 125 | 129 | 4.0 | 2.36 | ||
| SORC0063 | RC | 770,163 | 994,116 | 347 | -55 | 140 | 194 | 165 | 167 | 2.0 | 1.04 | ||
| SORC0063 | RC | 770,163 | 994,116 | 347 | -55 | 140 | 194 | 174 | 176 | 2.0 | 1.26 | ||
| SORC0063 | RC | 770,163 | 994,116 | 347 | -55 | 140 | 194 | 179 | 181 | 2.0 | 3.13 | ||
| SORC0072 | RC | 770,199 | 993,849 | 336 | -55 | 140 | 70 | 45 | 50 | 5.0 | 1.86 | ||
| SORC0072 | RC | 770,199 | 993,849 | 336 | -55 | 140 | 70 | 65 | 68 | 3.0 | 5.80 | Incl. 1m @ 15.67 g/t from 65m | |
| SORC0075 | RC | 770,144 | 993,986 | 339 | -55 | 140 | 200 | 81 | 85 | 4.0 | 2.49 | ||
| SORC0075 | RC | 770,144 | 993,986 | 339 | -55 | 140 | 200 | 185 | 189 | 4.0 | 3.51 | Incl. 1m @ 10.71 g/t from 188m | |
| SORC0085 | RC | 770,329 | 994,053 | 342 | -55 | 140 | 90 | 18 | 21 | 3.0 | 1.97 | ||
| SORC0085 | RC | 770,329 | 994,053 | 342 | -55 | 140 | 90 | 30 | 34 | 4.0 | 1.86 | ||
| SORC0085 | RC | 770,329 | 994,053 | 342 | -55 | 140 | 90 | 59 | 64 | 5.0 | 1.65 | ||
| SORC0088 | RC | 770,303 | 994,043 | 341 | -55 | 140 | 96 | 1 | 15 | 14.0 | 2.77 | Incl. 1m @ 18.52 g/t from 7m | |
| SORC0112 | RC | 770,569 | 994,163 | 340 | -55 | 140 | 90 | 67 | 69 | 2.0 | 22.61 | Incl. 1m @ 40.84 g/t from 67m | |
| SORC0114 | RC | 770,506 | 994,239 | 342 | -55 | 140 | 90 | 32 | 38 | 6.0 | 2.21 | ||
| SORC0150 | RC | 770,305 | 993,871 | 336 | -55 | 140 | 60 | 17 | 20 | 3.0 | 6.88 | ||
| SORC0150 | RC | 770,305 | 993,871 | 336 | -55 | 140 | 60 | 53 | 56 | 3.0 | 1.75 | Incl. 1m @ 16.27 g/t from 18m | |
| SORC0153 | RC | 770,375 | 994,038 | 341 | -55 | 140 | 90 | 13 | 35 | 22.0 | 3.52 | Incl. 1m @ 16.71 g/t from 20m; Incl. 1m @ 11.47 g/t from 21m;Incl. 1m @ 16.75 g/t from 26m; Incl. 1m @ 11.93 g/t from 40m | |
| SORC0153 | RC | 770,375 | 994,038 | 341 | -55 | 140 | 90 | 39 | 42 | 3.0 | 5.08 | ||
| SORC0153 | RC | 770,375 | 994,038 | 341 | -55 | 140 | 90 | 47 | 49 | 2.0 | 2.17 | ||
| SORC0154 | RC | 770,342 | 994,076 | 344 | -55 | 140 | 90 | 18 | 26 | 8.0 | 3.02 | Incl. 1m @ 13.23 g/t from 19m | |
| SORC0160 | RC | 770,408 | 994,192 | 345 | -55 | 140 | 90 | 20 | 22 | 2.0 | 5.91 | Incl. 1m @ 11.50 g/t from 21m | |
| SORC0160 | RC | 770,408 | 994,192 | 345 | -55 | 140 | 90 | 54 | 57 | 3.0 | 1.22 | ||
| Soman 2 | GBDDH096 | Core | 770,197 | 994,550 | 351 | -55 | 140 | 160.7 | 0 | 2 | 2.0 | 1.24 | |
| GBDDH096 | Core | 770,197 | 994,550 | 351 | -55 | 140 | 160.7 | 8 | 15 | 7.2 | 3.05 | ||
| GBDDH096 | Core | 770,197 | 994,550 | 351 | -55 | 140 | 160.7 | 57 | 59 | 2.0 | 1.67 | ||
| SORC0039 | RC | 770,154 | 994,565 | 344 | -55 | 140 | 186 | 66 | 71 | 5.0 | 4.19 | Incl. 1m @ 10.54 g/t from 88m | |
| SORC0039 | RC | 770,154 | 994,565 | 344 | -55 | 140 | 186 | 78 | 81 | 3.0 | 1.09 | ||
| SORC0039 | RC | 770,154 | 994,565 | 344 | -55 | 140 | 186 | 112 | 114 | 2.0 | 1.03 | ||
| SORC0039 | RC | 770,154 | 994,565 | 344 | -55 | 140 | 186 | 132 | 134 | 2.0 | 2.42 | ||
| SORC0039 | RC | 770,154 | 994,565 | 344 | -55 | 140 | 186 | 139 | 145 | 6.0 | 1.02 | ||
| SORC0046 | RC | 770,264 | 994,790 | 332 | -55 | 140 | 100 | 18 | 21 | 3.0 | 2.58 | ||
| SORC0093 | RC | 770,099 | 994,545 | 350 | -55 | 140 | 174 | 95 | 100 | 5.0 | 1.93 | ||
| SORC0093 | RC | 770,099 | 994,545 | 350 | -55 | 140 | 174 | 119 | 124 | 5.0 | 3.35 | Incl. 1m @ 13.10 g/t from 122m | |
| SORC0093 | RC | 770,099 | 994,545 | 350 | -55 | 140 | 174 | 136 | 140 | 4.0 | 2.23 | ||
| SORC0093 | RC | 770,099 | 994,545 | 350 | -55 | 140 | 174 | 159 | 168 | 9.0 | 1.74 | ||
| SORC0094 | RC | 770,122 | 994,603 | 351 | -55 | 140 | 201 | 59 | 61 | 2.0 | 1.42 | ||
| SORC0094 | RC | 770,122 | 994,603 | 351 | -55 | 140 | 201 | 100 | 103 | 3.0 | 1.25 | ||
| SORC0094 | RC | 770,122 | 994,603 | 351 | -55 | 140 | 201 | 123 | 133 | 10.0 | 2.99 | ||
| SORC0094 | RC | 770,122 | 994,603 | 351 | -55 | 140 | 201 | 138 | 140 | 2.0 | 1.97 | ||
| SORC0099 | RC | 770,347 | 994,567 | 352 | -55 | 140 | 95 | 16 | 22 | 6.0 | 2.87 | ||
| SORC0099 | RC | 770,347 | 994,567 | 352 | -55 | 140 | 95 | 45 | 47 | 2.0 | 1.07 | ||
| SORC0100 | RC | 770,147 | 994,611 | 351 | -55 | 140 | 130 | 24 | 26 | 2.0 | 1.22 | ||
| SORC0100 | RC | 770,147 | 994,611 | 351 | -55 | 140 | 130 | 81 | 88 | 7.0 | 1.97 | ||
| SORC0100 | RC | 770,147 | 994,611 | 351 | -55 | 140 | 130 | 110 | 122 | 12.0 | 1.69 | ||
| SORC0101 | RC | 770,153 | 994,677 | 352 | -55 | 140 | 230 | 44 | 47 | 3.0 | 1.96 | ||
| SORC0101 | RC | 770,153 | 994,677 | 352 | -55 | 140 | 230 | 86 | 90 | 4.0 | 1.41 | ||
| SORC0101 | RC | 770,153 | 994,677 | 352 | -55 | 140 | 230 | 130 | 137 | 7.0 | 1.31 | ||
| SORC0101 | RC | 770,153 | 994,677 | 352 | -55 | 140 | 230 | 167 | 169 | 2.0 | 1.20 | ||
| SORC0101 | RC | 770,153 | 994,677 | 352 | -55 | 140 | 230 | 178 | 181 | 3.0 | 1.79 | ||
| SORC0105 | RC | 770,350 | 994,602 | 352 | -55 | 140 | 90 | 9 | 11 | 2.0 | 2.72 | ||
| SORC0105 | RC | 770,350 | 994,602 | 352 | -55 | 140 | 90 | 16 | 20 | 4.0 | 2.04 | ||
| SORC0106 | RC | 770,297 | 994,507 | 349 | -55 | 140 | 50 | 26 | 29 | 3.0 | 3.14 | ||
| SORC0106 | RC | 770,297 | 994,507 | 349 | -55 | 140 | 50 | 33 | 35 | 2.0 | 1.03 | ||
| SORC0110 | RC | 770,285 | 994,679 | 354 | -55 | 140 | 90 | 0 | 9 | 9.0 | 7.03 | Incl. 1m @ 47.74 g/t from 0m | |
| SORC0110 | RC | 770,285 | 994,679 | 354 | -55 | 140 | 90 | 46 | 48 | 2.0 | 1.28 | ||
| SORC0172 | RC | 770,124 | 994,558 | 350 | -55 | 140 | 207 | 96 | 102 | 6.0 | 1.46 | ||
| SORC0172 | RC | 770,124 | 994,558 | 350 | -55 | 140 | 207 | 130 | 134 | 4.0 | 1.03 | ||
| SORC0172 | RC | 770,124 | 994,558 | 350 | -55 | 140 | 207 | 179 | 182 | 3.0 | 3.57 | ||
| SORC0173 | RC | 770,180 | 994,610 | 352 | -55 | 140 | 111 | 39 | 42 | 3.0 | 1.69 | ||
| SORC0173 | RC | 770,180 | 994,610 | 352 | -55 | 140 | 111 | 60 | 62 | 2.0 | 2.61 | ||
| SORC0173 | RC | 770,180 | 994,610 | 352 | -55 | 140 | 111 | 78 | 81 | 3.0 | 3.13 | ||
1All intercepts are apparent width. Based upon current interpretation it is estimated true thickness range between 70% and 90% of the drilled intersections.
Full drill results are available by clicking here.
1 For further information on the discovery target please refer to the Company’s news release dated October 7, 2024, and for information regarding the Koné deposit please refer to the Updated Feasibility Study available on Montage’s website and on SEDAR+. See “Technical Disclosure” below for details.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/e5862bb0-168a-46bf-94a3-83d9ac96d2e6
https://www.globenewswire.com/NewsRoom/AttachmentNg/80025f77-60ed-493d-8ad5-79bbb02e439d
https://www.globenewswire.com/NewsRoom/AttachmentNg/29a783c9-e1c6-4272-9f87-437dcfa20c79
https://www.globenewswire.com/NewsRoom/AttachmentNg/fa341898-344a-45c8-9142-4ee679808e2d
https://www.globenewswire.com/NewsRoom/AttachmentNg/bbba4933-2f41-4eb4-96e5-7e8c55eac855
https://www.globenewswire.com/NewsRoom/AttachmentNg/a629544a-9e38-4baf-8f45-efadbf43faba
https://www.globenewswire.com/NewsRoom/AttachmentNg/7f67aac9-8e9c-475a-8b9f-30d18dd545f9
https://www.globenewswire.com/NewsRoom/AttachmentNg/5c8ad012-cc32-4e97-bef4-68fed524a79b
https://www.globenewswire.com/NewsRoom/AttachmentNg/54f20bcc-d6ac-4cb1-99f7-3820e4c7aa18
https://www.globenewswire.com/NewsRoom/AttachmentNg/ce60cd07-ca2d-40a1-864a-d6f97b993818